Pylontech Phantom-S Скачать руководство пользователя страница 5

5

(c) Press ‘Up’ and ‘Down’ to choose the setting item No., press ‘Enter’ to enter into the
detailed setting parameter, when finish press ‘Enter’ again. The following setting items
need to be set follow the recommended value:

Item No.

Setting Value

Program 02

Set to N*25A, N=battery amount

Program 05

Set to USE

Program 12

Set to 48V

Program 13

Set to 51V

Program 26

Set to 53.2V

Program 29

Set to 47.5V

Note:

 

WKS 

Inverter

 

can

 

only

 

be

 

waked

 

up

 

via

 

battery,

 

if

 

the

 

battery

 

is

 

turned

 

off

 

due

 

to

 

over-discharge,

 

over

 

temp.

 

or

 

other

 

reasons,

 

in

 

order

 

to

 

wake

 

up

 

the

 

inverter

 

you

 

need

 

turn

 

on

 

the

 

battery

 

manually.

Any further questions to this SOP please contact us via

[email protected]

Program 27

Set to 53V

Содержание Phantom-S

Страница 1: ...but need finish the setting on Inverter software DOD 80 Working Temp 0 50 Indoor operation Charge Dischar ge Current N 25 N Battery amount Warranty 5yrs 3 Inverter set up a Connect PV or Grid power t...

Страница 2: ...2 b Open Solarpower exe the inverter set up software Log in c Press Parameters Setting...

Страница 3: ...00A 2 WKS Off grid Solution 1 General Compatible Condition Battery Type US2000B Phantom S Inverter Type WKS 1K 48 WKS 3K 48 WKS 4K WKS 5K Max charge current 33A 33A 140A 140A Recommend battery Amount...

Страница 4: ...4 3 Inverter set up a Connect Inverter with battery wake up inverter b Press Enter for 5s to enter into the setting...

Страница 5: ...et to N 25A N battery amount Program 05 Set to USE Program 12 Set to 48V Program 13 Set to 51V Program 26 Set to 53 2V Program 29 Set to 47 5V Note WKS Inverter can only be waked up via battery if the...

Страница 6: ...in the m must be we d the electric ery away fro heck produc t with the loc to cut off the o not mistake device the battery a e battery is de ell grounded cal paramete om water and Before ct and packin...

Страница 7: ...because equipment s o be moved wn the battery w atteries work ble the batte wder fire extin r or disassem do not unde of violation o afety standa I or repaired with different king with faul ery QC tab...

Страница 8: ...esult in ele rendering it i ong time it is an 80 rged within 1 de ust be discon er within 24 ho nts to clean b lammable or attery includ with PV solar w excluded for hibited to inse Safety specific ba...

Отзывы: