Annex 1: Installation and System Turn ON Progress List
Tick after
completion
No.
Item
Remark
☐
1
The environment is meeting all technical requirements.
3.3.1
Cleaning
3.3.2
Temperature
3.3.3
Radiating System
3.3.4
Heating System
3.3.5
Fire-extinguisher System
3.3.6
Grounding System
Refer to chapter
3.3
☐
2
Selection of installation sites.
Refer to chapter
3.4.3.
☐
3
Battery base is installed follow the technical
requirements.
Refer to chapter
3.4.4.
☐
4
Battery modules installation.
Refer to chapter
3.4.5.
☐
5
Battery system are fixed.
Refer to chapter
3.4.6.
☐
6
Control Module (BMS) and Battery Module are installed
well.
Refer to chapter
3.4.7.
☐
7
Connect
D+ and D-
between BMS to the inverter/PCS
or confluence cabinet.
Refer to chapter
3.5.2.
☐
8
Connect the grounding cable.
Refer to chapter
3.5.1.
☐
9
Double check every
power cables
,
communication
cables, grounding cable
installed well.
Refer to chapter
3.5.2 and 3.5.1.
☐
10
Switch the external power or inverter/PCS on, ensure all
the power equipment can work normally.
Refer to chapter
3.6.4.
☐
11
The first installation should do full charging progress
automatically.
If the status LED of BMS turns to blue, it means this battery
string is operation.
Содержание Force-H1
Страница 2: ......
Страница 24: ...20 34...
Страница 25: ...21 34...
Страница 26: ...22 34 3 4 7 Locking of the control Module s fix screw of left and right side...
Страница 28: ...24 34 Grounding cable must 10AWG The cable shall be copper with yellow green color...
Страница 33: ...29 34...
Страница 42: ......