PVR DRY 100 Скачать руководство пользователя страница 10

Operating and maintenance instructions

EN

10

LI 2078.05

8. De-commissioning

Drain the oil from the pump prior to the removal. 
If the oil is polluted, flush the pump with fresh oil (see “oil change”).
Drain the oil from the tank, plug the inlet and the discharge ports and store the pump 
without oil. 
In case of pump disposal, separate the pump parts by materials and trash the parts in 
accordance with the local regulations in the Country of use.

9. Return for repair

In case of pump return for repair to P.V.R., provide a list of substances which have come 
in contact with the pump  and advise the risks involved in handling, if any. Drain the 
lubricant from the pump prior to shipping the pump back.

10. Disposal

Meaning of the “WEEE” logo found in labels
The following symbol is applied in accordance with the EC WEEE (Waste Electrical 
and Electronic Equipment) Directive.
This symbol (valid only in countries of the European Community) indicates that the 
product it applies to must NOT be disposed of together with ordinary domestic or 
industrial waste but must be sent to a differentiated waste collection system. 
The end user is therefore invited to contact the supplier of the device, whether the 
Parent Company or a retailer, to initiate the collection and disposal process after 
checking the
contractual terms and conditions of sale.

Содержание DRY 100

Страница 1: ...DRY 100 DRY 250 DRY 300 Claw vacuum pumps Operating and maintenance instructions EN TRANSLATION Publication Number LI 2078 05 April 2021...

Страница 2: ...operation page 7 5 1 Location page 7 5 2 Electric connection page 7 5 3 Connection to the machine page 8 5 4 Discharge air pipe line installation page 8 5 5 Commissioning page 8 5 6 Tips for use page...

Страница 3: ...es place The suggestions given to the staff engaged in the installation and servicing assumes that the personnel is expert and prepared in facing any problem of servicing both mechanical and electrica...

Страница 4: ...nnectedtothelowershaftbymeansofacoupling 2 2 Expected use ThepumpsoftheDRYserieshavebeendesignedtohandleairandsmallquantityofwater vapour They are suitable for the evacuation of closed systems or for...

Страница 5: ...th the pump idle disconnected from the electrical supply with the pump cold vented to atmospheric pressure Prevent unexpected start up e g block the power switch with a personal lock ELECTRIC SAFETY S...

Страница 6: ...eck that the packing is intact or if is shows signs of damages occurred during transportation If there is no damage proceed to the unpacking and check further the machine In case damages are found inf...

Страница 7: ...patibility emissionstandardandimmunityforindustrial environments Check the main voltage and frequency in use to correspond to the data stamped on the motor name plate The electric motor must be protec...

Страница 8: ...pipes with the same diameter as the tank discharge port with a maximum length of 15 m For longer pipes increase pipe diameter Pipe weights must not rest on the pump In the final length use flexible p...

Страница 9: ...Change the oil every 5000 Rotant VF805 10000 Rotant VF 315 hours of operation draining the exhausted oil through the discharge ports 3 Use a oil ISO VG 150 When changing the oil also check the couplin...

Страница 10: ...th the pump and advise the risks involved in handling if any Drain the lubricant from the pump prior to shipping the pump back 10 Disposal Meaning of the WEEE logo found in labels The following symbol...

Страница 11: ...PVR Srl HEADQUARTERS Via Santa Vecchia 107 23868 Valmadrera LC Italy T 39 0341 1918 51 F 39 0341 1918 599 info pvr it www pvr it LOCAL UNIT Via IV Novembre 104F 23868 Valmadrera LC Italy...

Отзывы: