PVI Industries CONQUEST 20 L 100 A-GCL Скачать руководство пользователя страница 21

CONQUEST

® 

WATER HEATER

 

21 

PV500-70  10/15

 

8 VENTING 

8.1  Venting the CONQUEST:

 

All Conquest models use the positive pressure generated by the burner system blower to push combustion products 
out of the vent. Since the vent system is under positive pressure and must be capable of containing condensate, it 
must be constructed of schedule 40 solid PVC or CPVC pipe. Do not use PVC or CPVC pipe with cell/foam type 
construction (such as “CellCore”) or other non-solid PVC or CPVC plastic pipe. Polypropylene or single or double 
wall stainless steel venting listed by ETL, UL, ULC or CSA for Category IV positive pressure gas appliance venting 
may be used instead of solid PVC or CPVC plastic pipe venting.

 

If the cold inlet water temperature is above 

100°F, then solid CPVC or ETL, UL, ULC or CSA listed polypropylene or stainless steel venting is required 
and the vent limit switch must be adjusted for the higher temperature rating allowed by these vent materials 
(Contact factory for instructions).

 

Utilisez une catégorie IV PVC, CPVC ou ETL, UL, ULC ou CSA acier inoxydable ou inscrits conduit d'évacuation en 
polypropylène. Ne sélectionnez pas la taille du tuyau de ventilation basée uniquement sur le diamètre raccord de 
l'appareil. 

Follow the instructions below for installing solid PVC or CPVC pipe. For other listed vent materials, follow the vent 
manufacturer’s instructions for installation, sealing, supporting and terminating their vent system. Do not insulate 
plastic vent pipe. 

The stainless steel vent connection located near the front of the water heater is 4-1/2" O.D., to accept a 4 inch PVC 
or CPVC pipe coupling. A reducer coupling may also be used to accommodate smaller or larger vent pipe. (See 
Maximum Vent Length tables). Do not use a barometric damper with the Conquest positive pressure vent. 

The Conquest water heater can be vented either vertically, through a ceiling or roof, or horizontally through a wall. 
The Conquest is a Category IV positive pressure gas appliance venting and can be routed to the outdoors in any 
direction, from the flue outlet of the water heater, except down. The vent must be installed and supported at least 
every four feet to slope downward toward the water heater vent connection with at least ¼ inch drop per linear foot of 
horizontal vent run, to allow proper drainage of accumulated condensation. All penetrations through walls and roofs 
must be weather and gas tight, such that rain and products of combustion cannot pass from outdoors back indoors. 

Additional steps required when venting with solid PVC or CPVC pipe: 

1. 

Read and follow the information, instructions and warnings in “VENTING” section. 

2. 

Do not insulate the plastic vent pipe. 

3. 

Design the vent pipe route so that normal expansion (pipe getting longer) and contraction (pipe getting shorter), 
due to on and off temperatures, does not bind or put stress on cemented pipe fittings. 

4.  A 4 inch pipe coupling must always be the first fitting attached to the Conquest vent connection when using a 

PVC or CPVC vent system. If a listed stainless steel or polypropylene Category IV vent system is used, the 
correct adapter for attaching and sealing to the Conquest 4-1/2 inch O.D. vent connection must be obtained 
from the manufacturer of the vent system to be installed.  

5.  For PVC or CPVC, dry-fit the 4" pipe coupling onto the Conquest vent connector. Then remove the coupling and 

apply a liberal coating of room temperature vulcanizing (RTV) adhesive to the outside of the vent connector and 
to the inside of the plastic pipe coupling. Before the RTV sets, slide the coupling over the vent connector while 
rotating approximately 1/8 of a turn. Inspect and apply additional RTV to the joints, if needed to provide a sound 
air and water tight seal. 

6.  Drill a pilot hole through the PVC or CPVC coupling flange and into the center of the stainless steel vent 

connector flange in three equally spaced locations around the pipe. Drive stainless steel sheet metal screws 
through the pilot holes to attach and firmly hold the plastic coupling onto the vent connector flange.  

7.  Clean and deburr all solid PVC or CPVC pipe ends, then trial assemble the entire vent system vent before 

joining with cement. Mark the pipe and fittings to identify their locations, then disassemble. Reassemble the 
vent system using fresh PVC cement to connect PVC pipe and fresh CPVC cement to connect CPVC pipe. If 
both solid PVC and solid CPVC pipe are used in the same vent system, all joints between the two types of pipe 
must be made with fresh cement suitable for both materials. Follow the cement manufacturer’s instructions for 
making sound air and water tight joints. 

8.  Vent support – For PVC or CPVC, the vent system must be supported at intervals no greater than four feet, to 

prevent sagging, distortion and stress on pipe fittings. Vertical pipe must also be supported to avoid stress on all 
cemented pipe fittings and to prevent putting excessive weight on the appliance vent connection. For listed 
stainless steel or polypropylene vent system, follow the vent system manufacturer’s instructions. 

Содержание CONQUEST 20 L 100 A-GCL

Страница 1: ...EQUIPMENT READ AND FOLLOW THE INFORMATION IN THIS MANUAL AND ALL OTHER PROVIDED INSTRUCTIONS LABELS AND MARKINGS BEFORE INSTALLING OPERATING OR SERVICING THIS UNIT TO THE INSTALLER After installation...

Страница 2: ...ol Trains 6 3 Inlet Pressure 6 4 Manifold Pressure 6 5 Gas Piping Size 6 6 Appliance Isolation During Gas Supply Piping Pressure Test 6 7 Gas Connection 7 Combustion and Ventilation Air 7 1 Equipment...

Страница 3: ...1 EOS Register List 12 2 Error Codes 13 Remote Connections Terminal Strip 13 1 Making BMS BAS Remote Connection for Analog and Binary Signals 13 2 Terminal Functions 14 Sequence of Operation 15 Initi...

Страница 4: ...oduct contains or may come to contain materials that have been identified as carcinogenic or possibly carcinogenic to humans Before installing servicing or removing this product read and follow the su...

Страница 5: ...ntrols Use NIOSH MSHA approved respirators as required see MSDS Wear long sleeved loose fitting clothing eye protection and gloves FIRST AID MEASURES If any of the irritations listed persists seek med...

Страница 6: ...HYSICALLY HANDICAPPED HOSPITALS AND NURSING HOMES ELDER CARE FACILITIES AND REST HOMES ORPHANAGES AND CHILD CARE FACILITIES OTHER INSTALLATIONS WHERE RESPONSE TO CONTACT WITH HOT WATER MAY BE SLOWER O...

Страница 7: ...CONQUEST WATER HEATER 7 PV500 70 10 15 2 PRODUCT DESCRIPTION Component Controls and Connection Locations Locations May Vary...

Страница 8: ...on of the National Electrical Code ANSI NFPA No 70 In Canada the electrical service must conform to local electrical codes and or CSA C22 1 Canadian Electrical Code Part 1 All wiring between the unit...

Страница 9: ...ater gas vent combustion air electrical pump and other auxiliary optional equipment and connections 3 7 Other Code and Regulatory Clearances and Requirements Additional clearance beyond the minimum re...

Страница 10: ...quest should not exceed 100 F It is also recommended that the building return or dishwasher recirculation piping be connected to the return water connection located at the mid tank and not to the cold...

Страница 11: ...CONQUEST WATER HEATER 11 PV500 70 10 15 SINGLE STORAGE WATER HEATER WITH SUPPLEMENTAL STORAGE TANK TWO WATER HEATERS WITH REVERSE RETURN PIPING...

Страница 12: ...ing allowed by these vent materials Contact factory for instructions 3 Change the following EOS control settings on the Conquest water heater applied as the high temperature water source for a dish wa...

Страница 13: ...polypropylene or stainless steel venting Contact factory for instructions 4 Change the following EOS control settings on the Conquest water heater applied as a booster heater using the required CPVC o...

Страница 14: ...be added to the flue collector connection to relocate the condensate trap assembly as long as all added parts are at the same elevation After attachment the trap must be rotated so the offset in the...

Страница 15: ...onvenient place between the condensate outlet and a suitable drain and where the 3 threaded end cap can be removed to recharge the Neutralizer with crushed limestone a The CNS must be located such tha...

Страница 16: ...ype regulator manual test valve and manifold pressure taps These components may be separate or combined in a common housing WARNING Do not adjust or remove any screws or bolts on gas train control com...

Страница 17: ...1 The appliance and its provided manual shutoff valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of PSI 3 5 kPa 2 Th...

Страница 18: ...In Confined Spaces Equipment located in confined spaces requires two openings one commencing within 12 30 5 cm from the top of the enclosure room and one commencing within 12 from bottom of the enclo...

Страница 19: ...ch as galvanized ventilation pipe is shown in the chart below titled Maximum Air Inlet Duct Equivalent Length Use metal tape or RTV sealant to seal each pipe joint Maximum Air Inlet Duct Equivalent Le...

Страница 20: ...nd a combined duct system designed by one of the duct design firms identified at www pvi com vent design html Before operation of a combined remote air ducting system all of the duct design firm s sys...

Страница 21: ...ts of combustion cannot pass from outdoors back indoors Additional steps required when venting with solid PVC or CPVC pipe 1 Read and follow the information instructions and warnings in VENTING sectio...

Страница 22: ...r death WARNING Do not vent this water heater into an existing or traditional gas vent or chimney do not combine the vent with any other appliance and do not use a barometric damper in the vent Such v...

Страница 23: ...2 feet 0 61 m above the highest point of the roof within a 10 foot 3 05 m radius of the termination 10 A vertical termination less than 10 feet 0 91 m from a parapet wall must be a minimum of 2 feet 0...

Страница 24: ...3 x 32 127319 KIT VENT CONCENTRIC 3 CPVC IPEX 196107 for CPVC 3 x 32 Each IPEX System 636 vent kit includes or specifies the required pipe fittings hardware adhesives and Installation instructions Fol...

Страница 25: ...nt lengths provided in this Installation Maintenance Manual Remember to include the IPEX System 636 Concentric Vent Termination Kit in the maximum equivalent calculation When calculating the additiona...

Страница 26: ...nywhere between the appliance and the vent termination point such that it is unable to expand or contract as it heats and cools during operation e The weight of the concentric kits must be supported b...

Страница 27: ...hazardous materials or death 9 OPERATING AND SAFETY CONTROLS 9 1 Temperature and Pressure Relief Valve s A Temperature and Pressure Relief Valve s sized in accordance with the ASME Boiler and Pressure...

Страница 28: ...ed on the controller touch screen This failure lockout can be reset by pressing the LWCO RESET button located on the front control panel Once the LWCO control board has been reset the Main Reset butto...

Страница 29: ...IM ID Card Touch Screen User Interface BTC II 10 1 Touch Screen User Interface The touchscreen of the EOS provides one touch access to view and adjust various Menu set points The touchscreen displays...

Страница 30: ...low PREP The EOS is Pre Purging the burner system IGN The Hot Surface Igniter is hot and the gas valve has opened to attempt burner ignition 4 seconds BURN The Burner has ignited and the flame has bee...

Страница 31: ...r located in the flue outlet TANK TOP Displays the current temperature at the top of the water heater tank as measured by the operating control sensor located near the hot outlet TANK BOT Displays the...

Страница 32: ...r details Control System Menu Descriptions Menu Description SETUP Displays and modifies the temperature control set points for the burner integral tank circulator and the SANI functions SOURCE Display...

Страница 33: ...e NEXT ITEM or BACK ITEM buttons or when exiting the menu by pressing the HOME button 10 7 Setting The Real Time Clock User Installer Level Access The TIME MENU allows the user to program the time of...

Страница 34: ...vent day schedule might look like this The 1st occupied time begins at 6 00am and the 1st unoccupied time begins at 11 00am therefore between the hours of 6 00am and 11 00am the occupied set point wil...

Страница 35: ...OVR function back to AUTO Failure to return the MAN OVR function to AUTO can cause high water temperatures that can result in property damage scalding other serious injury or death 10 10 Potentiomete...

Страница 36: ...it This will force the burner to operate at a reduced firing rate to prevent overheating N A 5 AIR FLOW FAIL During blower purge periods the air flow proving switch is not closing this circuit This co...

Страница 37: ...may only be reset by the on board manual reset button or the remote reset input HTR MAX The heater high limit temperature safety has exceeded its limit This condition may be caused by a sensor failure...

Страница 38: ...tablished 1 Enter the Network Menu as previously explained The first screen ADDRESS will allow the user to set the network address for each individual heater There are up to 247 addresses beginning wi...

Страница 39: ...Read Input S16 F 22 to 266 111 Modulation Rate Read Input U16 0 to 100 112 Flame Current Read Input U16 0 1V 0 10 0 113 Burner Runtime Read Input U16 Hours 0 65535 114 Burner Cycles Read Input U16 Nu...

Страница 40: ...ler Outlet Tank Top Sensor 12 Boiler Inlet Tank Bottom Sensor 13 Vent Sensor 14 Hi Limit Sensor 15 Ignition Failure 16 Flame Loss 17 Vent Hi Limit 18 Boiler Tank Hi Limit 19 False Flame 20 OEM Card 21...

Страница 41: ...ter from remote master control Terminals are wired to a relay in a remote Energy Management System When the relay closes the circuit from R1 to R2 is completed and appliance controls are enabled This...

Страница 42: ...nk thermistor temperature If the two temperatures are not the same a sensor failure will result d When the High Temperature Limit operation has been verified by comparison the limit temperature will t...

Страница 43: ...n the main control switch is turned on the control system will continuously monitor the water temperature in the tank and attempt to maintain a uniform water temperature within the tank by using the i...

Страница 44: ...ges AC DC Multi meter with 20 000 OHM Volt rating Amp Meter Normal Hand Tools 15 3 Resources Product Installation Maintenance Manuals Start up Report with instructions Local State Federal Codes Websit...

Страница 45: ...re of the operating gas valves For example a solenoid actuated gas shutoff valve After any leaking valve is replaced the reassembled gas train must be leak tested again before start up is attempted 5...

Страница 46: ...rner lights but blows out ensure that the burner firing rate is locked in low fire and check for improper combustion or weak flame signal as a possible cause 21 Burner Combustion Adjustment Burner com...

Страница 47: ...ocated seperate from food and utensil handling areas When this is not possible in a food service installation the water heater must be sealed to the floor to prevent water from accumulating underneath...

Страница 48: ...heck for 120V at the common side of air switch Check if switch tubing is connected on both ends Remote Proving Interlock When terminal C1 and C2 are used a proving circuit for remote equipment failure...

Страница 49: ...Low Voltage Fault 5 flashes Check the 24 VAC input voltage The voltage must be above 18 0 VAC Vent Temperature Fault 6 flashes Check for a blocked flue Check the vent sensor and connections Hi Limit F...

Страница 50: ...ID AGC 124175 124175 6 CLAMP HOSE 1 4 NYLON 120333 120333 120333 7 CLAMP HOSE STAINLESS 3 9 16 X 4 1 2 OD 124710 124710 124710 8 ADAPTER AIR INTAKE 3 1 2 ID X 2 1 2 124894 124894 124984 9 GASKET FLANG...

Страница 51: ...IN 122319 122319 122319 12 JUMPER TERMINAL BLOCK WAGO 280 402 23A 122320 122320 122320 13 SWITCH AIR PROVING CLEVELAND CONTROLS NS2 1166 01 0 50 WC 121444 121444 121444 14 FLAME CONTROL PIM FENWAL 126...

Страница 52: ...36 5336 3 UNION BLACK 3 4 5928 5928 5928 4 NIPPLE BLACK 3 4 X 2 5991 5991 5991 5 NIPPLE BLACK 3 4 X CL 5989 5989 5989 6 ELL STREET BLACK 90DEG 3 4 6184 6184 6184 7 COUPLING FULL BLACK 3 4 3000 SA105 F...

Страница 53: ...LLER 120090 120090 120090 3 O RING GASKET 4 25 OD X 3 50 ID X 375 CS EPDM 80 DUROMETER 122423 122423 122423 4 VALVE BALL 3 4 JOMAR 100 654G BRASS THREADED X HOSE 124557 124557 124557 5 VALVE T P RELIE...

Страница 54: ...CONQUEST WATER HEATER 54 PV500 70 10 15 18 6 Component Wiring and Conduit Routing Details...

Страница 55: ...perly installed and adjusted units seldom need heat exchanger cleaning If soot has formed the most common causes are restricted combustion air or excessive gas A blocked heat exchanger can cause unsaf...

Страница 56: ...10 8 for information about operation of the pump 7 Inspect low water cutoffs and relief valves for proper operation at every six months or more often if indicated by inspection 8 Keep appliance area...

Страница 57: ...ions 7 Inspect burner and gas train components for wear or deterioration 8 Check the electronic ignition system for quick ignition and proper flame signal 9 Check gas safety shut off valves for proper...

Страница 58: ...tally vented gas fueled equipment shall not approve the installation unless upon inspection the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of...

Страница 59: ...CONQUEST WATER HEATER 59 PV500 70 10 15...

Страница 60: ...he warranty on the heat exchanger does not cover poor performance structural failure or leaking due to an excessive accumulation of scale Warranty Forms Ship Separately With Each Product MODEL NUMBER...

Отзывы: