Nixie Tube Clock ‘Nixie QTC’
Issue 10a (21 March 2014)
www.pvelectronics.co.uk
- 18 -
5.4 High Voltage Generator Test.
- Refer to the warnings on page 5
- Insert IC2 into its socket. Orient the notch on the IC with the
notch on the IC socket and the PCB marking.
- Power up the PCB, and using the GND and HV test points,
measure the high voltage generated using a voltmeter on DC
setting. It should be between 167 and 173. If this is in order,
disconnect the power supply.
Finally, remove IC2 from its socket and replace on its static-
protective foam. It is best kept safe until needed for the tube tests
later in the assembly.
5.5 C5 (33pF)
C6 (15pF)
X1 (32.768KHz Crystal)
C7, C9, C10 (100nF)
Содержание Nixie QTC
Страница 57: ...Nixie Tube Clock Nixie QTC Issue 10a 21 March 2014 www pvelectronics co uk 57 ...
Страница 58: ...Nixie Tube Clock Nixie QTC Issue 10a 21 March 2014 www pvelectronics co uk 58 14 CIRCUIT DIAGRAM ...
Страница 59: ...Nixie Tube Clock Nixie QTC Issue 10a 21 March 2014 www pvelectronics co uk 59 ...
Страница 60: ...Nixie Tube Clock Nixie QTC Issue 10a 21 March 2014 www pvelectronics co uk 60 ...