Installation Guide / SolarRoof™ Slate Tile
7
Code-Compliant Planning and Installation Guide V1.0 - Complying with AS/NZS1170.2-2011 AMDT 2-2016
Figure 4.2.4
3) Drill 10 mm hole on the marked location of tile and stop when reaching the purlins.
Note: For some installations, there is a need to drill through two tiles (overlap) to reach the purlin
7) Rail, clamps, and panel installation
Please refer to
PV-ezRack® Solar Roof Installation Guide
for steps on installing rails, clamps and PV panels.
The guide also gives our standard engineering spacing for tile interface based on site conditions.
2. Hangar Bolt Installation
1) Purlins are to be identified when opening tiles and their positions are marked out on the tiles.
2) Based on installation plan and Hanger bolt spacing information, hanger bolt locations are marked on the tiles.
Note: Hangar bolt spacing is equivalent to the tin spacing which is provided in our
PV-ezRack® Solar Roof Installation
Figure 4.2.3A
Figure 4.2.3B
- Installation Instructions -
4) Through 10 mm hole on the tiles, pre-drill 6 mm hole on the wood purlin for hanger bolt. The tiles are not removed
when drilling this hole. After the drilling, clean the dust around 10 mm hole.