background image

Installation Guide /  SolarRoof™ Slate Tile

12

Code-Compliant Planning and Installation Guide V1.0 - Complying with AS/NZS1170.2-2011 AMDT 2-2016

Our Products may come with guarantees that cannot be excluded under the Australian Consumer Law. You may be 
entitled under statute to a replacement or refund for a major defect in the Products. You may also be entitled under 
statute to have the products repaired for any defect which does not amount to a major defect. The benefits given by 
this Warranty are in addition to any statutory rights and remedies you may have under Australian law.

Product Care

Clenergy Products are designed to be durable with minimal care, however it is important that you maintain your 
mounting Product in accordance with proper practices. This includes regular maintenance and inspection to avoid 
damage.

The aluminum components are made from either AL 6005CL-T5 or AL6005-T5 and may also have a clear anodization. 
The aluminum may undergo some surface oxidization in service. Please note that this is normal and part of the natural 
ageing process. The result may even be beneficial to the longevity of the Product, as the oxidization can provide 
additional protection against degradation by pollution and atmospheric corrosion.

• 

You should also ensure that if the Product is stored prior to installing that it is not contaminated by contact with rusty 

  items or other impurities such as dirt and chemicals. Should this occur, you must clean the Product and make any 
  repairs using approved methods such as galvanized paint and antirust treatments immediately before installation. 
  Steel components should be inspected before and after installation and any damage to the galvanizing should be 
  treated immediately to prevent rusting. It is normal for galvanized Products to develop a surface barrier (the ‘patina’), 
  which helps to protect the surface from contaminants in the atmosphere and does not adversely affect the Product.

• 

The torque values of fastener connections on mounting system must be checked annually and corrected if needed in 

  accordance with Clenergy Australia’s installation manual.

• 

Regular cleaning to remove any soil or other possible contaminants must also be performed. Cleaning should be 

  performed in accordance with guidelines recommended by the Standards Association of Australia (AS 1231-2000) 
  (for aluminium Products) and the Galvanizers Association of Australia (GAA) (for steel Products supplied in Australia) or 
  the Galvanizers Association of New Zealand (GANZ) (for steel Products supplied in New Zealand) or any other similar 
  organisations (as applicable). When using tin interfaces for installation works, screws not exposed to frequent rain 
  should be washed down with fresh water at least every 6 months.

- Product Warranty -

Содержание SolarRoof Slate Tile

Страница 1: ...SolarRoof Slate Tile Code Compliant Planning and Installation Guide V1 0 Complying with AS NZS1170 2 2011 AMDT 2 2016 Ver 1 0 Last Updated Oct 2021 ...

Страница 2: ...Verifying atmospheric corrosivity zone of installation site by referring to AS 4312 2008 or consulting local construction business to determine appropriate products and installations Complying with all applicable local or national building codes including any updates that may supersede this manual Ensuring that PV ezRack and other products are appropriate for the particular installation and the in...

Страница 3: ...g Marker Pen Slate Rip Lead Flashing Tools and Components Tools Manufacturer Clenergy Components ER EC ST End Clamp ER IC ST Inter Clamp C U 30 46 G Universal Clamp with Grounding Clip C U 30 46 Universal Clamp ER EC DU35 40 End Clamp Dual 35 or 40mm ER EC DU40 46 End Clamp Dual 40 or 46mm ER R ECO ECO Rail ER SP ECO Splice for ECO Rail ER I 02 Flat Tile Interface SCO ECO 380 Side Channel Cover fo...

Страница 4: ...ant Planning and Installation Guide V1 0 Complying with AS NZS1170 2 2011 AMDT 2 2016 Manufacturer Clenergy Components EZ RE 200 Roof Hook Extender ER HB 8 150 Hanger Bolt for wood purlin ER HB MP 8 150EP Hanger Bolt for metal purlin Tools and Components ...

Страница 5: ...NZS1170 2 2011 AMDT 2 2016 System Overview A End Clamp B Inter Clamp C ECO Rail D Tile interface A End Clamp B Inter Clamp C ECO Rail D Tin interface E Hangar Bolt A A A A D D D D E E B B B B C C C C PV ezRack SolarRoof Slate Tile with Tile Interface PV ezRack SolarRoof Slate Tile with Hanger Bolt System Overview ...

Страница 6: ...the roof battens 2 Removing Slate Tiles Determine the positions of the tile brackets according to your plans Take out the nails on the slate tiles and remove two or three slate tiles at the marked positions Slate tiles are removed by using a slate rip which unhooks the nail that secures the slate By hitting the slate rip handle with a hammer the nail is pulled out Thus allowing slate to be removed...

Страница 7: ...screwdriver until the screw is fastened Use wooden packers to lift the tile bracket so that the base does not rest on the tile as shown in Figure 4 1 4B 5 Apply flashing around Tile Bracket For prevention of water leakage it is important to using flashing to secure the installation against rainwater Cut out lead flashing to fit the profile of the tile bracket Cover the bracket with the flashing an...

Страница 8: ...also gives our standard engineering spacing for tile interface based on site conditions 2 Hangar Bolt Installation 1 Purlins are to be identified when opening tiles and their positions are marked out on the tiles 2 Based on installation plan and Hanger bolt spacing information hanger bolt locations are marked on the tiles Note Hangar bolt spacing is equivalent to the tin spacing which is provided ...

Страница 9: ...ickness need to be verified to decide position of rubber seal for appropriate penetration depth 2 It is recommended to apply Sikaflex on the area around 10 mm hole of the tile before fixing hanger bolt Please refer Sikaflex instructions for use Figure 4 2 5 Figure 4 2 6A Figure 4 2 6B 6 Screw out the top nut of hanger bolt connect and adjust tin foot position and tighten the top nut with the recom...

Страница 10: ...1170 2 2011 AMDT 2 2016 Certification Letter The accredited spacings depend on the method of installation Please refer to table below for reference to the correct manual for your installation method Mounting System Setup Manual Tile Interface PV ezRack Solar Roof Installation Guide Hangar bolts Certification Letter ...

Страница 11: ...stomized Product Product Warranty Corrosivity Category 1 2 and 3 Corrosivity Category 4 Corrosivity Category 5 1 Aluminium Components 6005CL T5 mill finish Standard 10 years 10 years 6005 T5 anodized to 10 microns 6005 T5 anodized to 15 microns Customized 10 years 10 years 6005 T5 anodized to 20 microns 10 years 2 Galvanized Steel Components Galvanized Steel at 85 microns in average Standard Not w...

Страница 12: ...rranty period are the responsibility of the customer Where Clenergy attends a site and finds that the Product is not faulty the costs for the visit will be payable by the customer Defective Products shall be uninstalled and or reinstalled at the customer s expense and risk Under certain conditions the Warranty can be extended to more than 10 years at an extra cost available upon request Warranty E...

Страница 13: ...t if the Product is stored prior to installing that it is not contaminated by contact with rusty items or other impurities such as dirt and chemicals Should this occur you must clean the Product and make any repairs using approved methods such as galvanized paint and antirust treatments immediately before installation Steel components should be inspected before and after installation and any damag...

Страница 14: ... St Clayton VIC 2168 Australia Phone 61 3 9239 8088 Email sales clenergy com au Web www clenergy com au Clenergy Clenergy_global ClenergyClub Clenergy ClenergyGlobal ClenergyClub ClenergyAUS A Clenergy Technologies Company ...

Отзывы: