NO FRILLS 500/800 Guides
Before mounting!!
Please pay attention to the following points before you fit in your NO FRILLS installation and
take in operation!
1. The installation should be taken in operation within 12 months after delivery
2. The installation should about every 7 days, in very hot areas, every 3 days, operated
with sea water or flushed with fresh-water.
3. If the installation is for a long time out of order, it should at the latest after 12 months
flushed and preserved again.
4. Never operate the system in harbors or in areas where fuel and oil is in the sea-water.
5. If you use the system in fresh - or brackish water, the operating-pressure must be
adjusted, that the output of fresh water is within the operating limits.
6. Protect the installation from freezing.
7. Don't let the membrane dry out. If you take out the membrane for any reason, it has to
be sealed immediately.
8. The sea-water- inlet must be shaped so that the sea-water is pressed in during cruise.
Attention!!
The quantity of the produced drinking water is very strong dependent on the temperature of
the sea-water. All accomplishment-statements are based on a temperature of the sea-water
of 25°C. Per 1°C below 25°C, the production loses 3 percent of performance.
As well, the salinity of the sea water is a factor. Higher salinity, lower performance.
5
Содержание NO FRILLS 1000 GPD
Страница 16: ...NO FRILLS 500 800 Guide Flow diagram Installation above Waterline 12...
Страница 26: ...NO FRILLS 500 800 Guide Manufactures Literature For Interpump CAT Pumps will have an attached CD 21...
Страница 27: ...NO FRILLS 500 800 Guide Manufactures Literature 22...
Страница 28: ...NO FRILLS 500 800 Guide Manufactures Literature 23...
Страница 31: ...NO FRILLS 500 800 Guide The John Guest System 26...
Страница 32: ...NO FRILLS 500 800 Guide Wiring 27...