STEP 5: Gate Construction
Measure the distance between the gate support post and subtract ½”. Cut the gate rails to this
measurement.
Note: Cut equal amounts off each end of the rail to ensure balanced spacing of spindles.
Install gate rails and spindles (DIAGRAM 3) but do not attach with screws yet. Measure the
width of the gate to be sure the gate will fit between gate support posts (DIAGRAM 4) and that
the gate is perfectly square.
Attach gate rails to gate end-posts using two #8 x ¾” screws per attachment point.
PURELINEPOOL.COM
TEL: 407-834-2200
2
Содержание Above Ground Pool Gate
Страница 1: ...Above Ground Pool Gate INSTALLATION MANUAL...
Страница 4: ...PURELINEPOOL COM TEL 407 834 2200 3...
Страница 6: ...PURELINEPOOL COM TEL 407 834 2200 5...
Страница 7: ...PURELINEPOOL COM TEL 407 834 2200 6...