Installing the Gate
STEP 1: Gate Mounting Bracket
Slide supports into mounting base (DIAGRAM 1). Screw two #8 x ¾” screws into both sides of
each support, attaching it to the mounting base.
The support should be inserted flush to the
backside of the mounting base.
STEP 2: Location
Determine the location of the gate. The
maximum width is 38”. You may be required to
install an artificial upright.
For more information, please refer to Step 2-B:
Artificial Upright.
STEP 3: Mounting Brackets
Install gate mounting brackets to each designated upright. If the Pureline Above Ground Fence
is already installed, remove one end post and support and
replace with a gate mounting bracket and the gate post.
If the fence isn’t installed, follow step 2-A for installing
mounting brackets using four #12 x 1” screws.
STEP 4: Gate Post
Install gate posts (DIAGRAM 2). Slide gate posts onto gate
mounting brackets. Allow at least ½” between the post and
the pool’s top cap. This allows for an easy winter cover
installation.
Attach gate post to gate mounting bracket using eight #8 x
¾” screws.
PURELINEPOOL.COM
TEL: 407-834-2200
1
Содержание Above Ground Pool Gate
Страница 1: ...Above Ground Pool Gate INSTALLATION MANUAL...
Страница 4: ...PURELINEPOOL COM TEL 407 834 2200 3...
Страница 6: ...PURELINEPOOL COM TEL 407 834 2200 5...
Страница 7: ...PURELINEPOOL COM TEL 407 834 2200 6...