7

.1 

PLACE OF INSTALLATION

The  dehumidifier  is  suitable  for  indoor  usage.  For  the  convenience  of 

maintenance  and  inspection,  some  space  around  the  machine  should  be 

retained  (800mm  gap  at  least).  In  order  to  prevent  condensation  inside  the 

machine, the dehumidifier should not be put into the condition in which the air 

temperature is below the dew point. 

In  addition,  if  the  machine  is  installed  outdoors,  some  protective  measures 

should be 

taken

 to prevent rain, snow and dust etc.

In  any  case  the  dehumidifier  has  to  be  installed  on  a  horizontal  ground  or 

platform, which has to be able to sustain the weight of it

.

 After the 

installation,  it  would  be  wise  to  re-check  the  ground  or  the  platform  on 

which  the  dehumidifier  has  been  placed.  In  case  the  dehumidifier  has  to  be 

mounted, the retaining base should be from stainless steel.

The  dimension

s

  of  duct  for  process  air  and  reactivation  air  should  be  in  line 

with ISO7807  recommended  values.  Ducting  should  be  connected  with 

the connection part on flange. 

Please 

pay attention to the

 following 

notes about the duct

 connection.

In  order  to  reduce  loss  of  static  pressure,  it  is  advice

d

  to  install  with  the

shortest

 

length of duct possible.

In order to ensure the maximum perfomance of the machine, all connctions

have to be done right, without any loss of air.

The  duct  should  have  a  good  capacity  of  thermal  insulation,  to  prevent

moisture condensation inside or outside the duct surface.

To  reduce  noise  and  vibration  transmitted  along  the  duct, 

high 

quality,

 

soft

and strong airtight adapting pieces should be used in the joint parts.

The air valve 

can

 be installed in

side

 the duct of process air and reactivation air

if

 

it is needed.

If the reactivation air is introduced from outdoor air, the reactivation air duct

should  be  high  enough  off  the  ground  to  prevent  inhale  of  dust  and  debris,

meanwhile,  it  must  be  far  away  from  some  sources  of  pollution,  such  as

energy  emissions,  steam  and  gases.  In  order  to  prevent  wet  air  outlet  is

inhaled back into machine, the distance between the regeneration inlet air and

wet air outlet should be at least distant by 1 meter.

If the outlet air contains a high amount of moisture, droplets may form inside

the conduit. In this case, the drain should be positioned vertically so that the

droplets  flow  smoothly  out  of  it.  If  installed  horizontally,  these  droplets  will

remain in the interior and may cause long-term corrosion of the pipeline.

11

ΕΝ

Содержание PDD 200M

Страница 1: ...USER S MANUAL ENGLISH Desiccant Dehumidifier PDD 200M...

Страница 2: ...LANGUAGES ENGLISH 3 21...

Страница 3: ...PDD 200M Desiccant lift dehumidifier is distinguished among its class by its excellent performance quite operation and double air inlets which guarantee efficiency regarding humidity issues Please ref...

Страница 4: ...the unit is misplaced or tipped unplug the power cord immediately Make sure the unit is completely dry before resuming operation l Disconnect the device if abnormal sounds odors or smoke occur l If t...

Страница 5: ...xample T 3 15A 250V or 350V etc Power o the dehumidi er before removing the plug 3 SOCIABLE REMARKS ENVIRONMENTAL PROTECTION Disposal of equipment no longer used Please follow the instructions below w...

Страница 6: ...pplications that requiring low air humidity The desiccant dehumidifier operates based on the adsorption principal Treated air is simply passed through a porous wheel of solid desiccant and its moistur...

Страница 7: ...purpose The machine is designed for easier maintenance The machine s panel can be easily screwed and unscrewed for machine troubleshoot And the electrical panel can be easily located and opened hinge...

Страница 8: ...ure to allow better energy saving The processed air outlet can be connected to an other air treatment equipment according to the user needs The slow rotation of wheel is realized through the motor and...

Страница 9: ...n KW Input 1 2 Current 5 22 Operating Temperature 20 C 60 C Capacity 0 6 kg h Air Inlet 210m3 h 100PA Regenerated Air Inlet 60m3 h 50PA Dimension L x W x H 620x404x336mm Ner Weight 46 Kg 6 TECHNICAL D...

Страница 10: ...ase contact the distributor Connect the product to the air ducts If you have any doubts about the placement if the dehumidifier or you believe that some parts are missing please contact the manufactur...

Страница 11: ...ssure it is adviced to install with the shortest length of duct possible In order to ensure the maximum perfomance of the machine all connctions have to be done right without any loss of air The duct...

Страница 12: ...ted through a duct to the designated area you desire Otherwise it will normally come out of the dehumidifier output 7 2 2 Outdoor Installation The processed air inlet and outlet have to be ducted to t...

Страница 13: ...ir outlet if you would like to reduce the dehumidi cation capacity 7 2 3 Electrical connection Caution All electrical connections have to obey local electrical equipment installation standards done by...

Страница 14: ...value of each parameter displayed in PV screen OUT green When indicates are green it means that they are in operation SET Press this key for 3 seconds to enter set mode or press it once to check the S...

Страница 15: ...0 0 50 0 dp 0 1 LOCK 0 150 Description Set the required humidity Set P to 0 Set the hysteresis value 0 without decimal point 1 with demical point LOCK 0 every value change in each mode allowed LOCK 1...

Страница 16: ...low the machine cool down completely before carrying out any maintenance Air Filter Our desiccant dehumidifier is equipped with two air filters one for processing airflow and the other is for reactiva...

Страница 17: ...10 FREQUENTLY ASKED QUESTIONS TROUBLESHOOTING 17...

Страница 18: ...ccidental damage sabotage defects caused by normal wear and tear including wear of consumable parts ie parts that require periodic replacement during normal use of the system Fractures tears scratches...

Страница 19: ...fic characteristics of each case The means and costs of transportation to and from Puredry technical support points as well as the possible insurance of the products are the choice and responsibility...

Страница 20: ...ll the fields as shown below Once the warranty submission has been completed a confirmation message will be sent to your email l Visit our web site and activate your warranty via the below link https...

Страница 21: ...GR 21 1 22 2 23 3 23 4 24 6 28 7 29 9 33 10 35 36 5 24 8 PDD 200M Desiccant 25 25 26 27 27 29 30 5 1 5 2 5 3 5 4 5 5 7 1 7 2 11 37...

Страница 22: ...GR 22 1 l 8 l l l l l l l l l 3 l l l l l l l l l l l l l l l l...

Страница 23: ...GR 23 24 2 l l l l l l l l PCB T 3 15A 250V 350V 3 l 2002 96 EC 27 2003 l CO2 l A B...

Страница 24: ...1 2 3 4 5 15 6 7 1 8 9 10 4 GR 24 5 desiccant...

Страница 25: ...GR 25 1 2 mm 5 2 5 3...

Страница 26: ...GR 26 60 PID SCR 5 4...

Страница 27: ...GR 27 60 5 5 5 6...

Страница 28: ...PDD 200M Dessicant V Hz 220 240 50 KW 1 2 5 22 20 C 60 C 0 6 kg h 210m3 h 100PA 60m3 h 50PA x x 620x404x336 46Kg 28 GR 6 20 C 60 RH 1 5 59Kg...

Страница 29: ...29 GR 7 7 1 80 ISO7807 O...

Страница 30: ...30 GR 7 2 7 2 1 1...

Страница 31: ...GR 7 2 2 31 Puredry...

Страница 32: ...GR 32 7 2 3 Volt 7 2 4 1 1 5...

Страница 33: ...GR 33 8 1 PV SV PV OUT SET set 3 SV 3 3...

Страница 34: ...1 2 SP 3 PV SP SV set PV SV OUT PV SV OUT 34 GR SP 0 100 P 0 9999 Hy 0 1 50 0 Sc 50 0 50 0 dp 0 1 LOCK 0 150 P 0 0 1 LOCK 0 LOCK 1 LOCK 0 1 30 0 2 0 0 0 0 0 0 1 3 2 3 4 ON OFF...

Страница 35: ...15 15 Puredry GR 35 9...

Страница 36: ...10 GR 36...

Страница 37: ...11 GR 37 Puredry Hellas Puredry...

Страница 38: ...Puredry Puredry Puredry Hellas EE service 15 38 GR...

Страница 39: ...l link https www puredryhellas com egguiseis l email...

Отзывы: