7
Installation
(Continued)
8. Orient the Ballast to allow the Power
Outlet to face the the ideal direction.
9. Align the ARC Cell’s screw holes with
the holes on the Ballast in a way which
will allows air to pass through the Cell
once mounted into the duct.
10. Mount the Cell onto the Ballast,
ensuring that the UV Bulb’s prongs
fully insert before fastening the screws.
Note: The UV bulb can only be inserted one way,
but it can rotate inside the cell to accomodate
your required cell orientation.
11. Place the unit through the hole in the
mounted faceplate so that airflow
always passes through the honeycomb.
12. Thread the four (4) Knurled Thumb
Nuts onto the Threaded Bolts,
making sure a seal is created along
the backside of the Ballast Housing.
13. Plug the Power Cable into your unit
and then into the outlet. Ensure that
both the Unit Power LED and Cell
Power LED are active.
Содержание HVAC
Страница 1: ...Owner s Manual ...
Страница 11: ...11 ...
Страница 12: ...OM REVISION GTE pureAir_HVAC OwnersManual 200609 ...