PureAire Monitoring Systems, Inc.
5/25/07
29
Exploded view of Vertical Bulkhead Fitting for Gas Cabinet & VMB
A
Gas Sensor Cell
Fastens directly into the sensor cell holder flange
B
Sensor cell holder
Curved to fit the OD of duct.
C
Duct Wall – not more than 0.375 inches thick
Installation Instructions
Note:
The bulkhead holder is
designed to mount the sensor cell
on a vertical duct positioned at a
45
o
angle from vertical.
1)
Cut a 2” hole in the duct wall, [C]
2)
Mount Bulkhead mounting flange [B]
to the duct wall with self tapping
screws.
3)
Insert cell into the flange, [B] and
fasten by turning the cell clockwise.
Please note the sensor cell is labeled
with the proper direction when
fastened into the flange.
Air Flow
PureAire Monitoring Systems, Inc.
557 Capital Drive Lake Zurich, Illinois 60047
Phone 888-788-8000 Fax: 847-726-6051
Email:
Bulkhead Mount Vertical for Gas Cabinet and VMB DATE: Sept 17, 2003
SCALE: None
B
C
A
Содержание Air Check Lite
Страница 26: ...PureAire Monitoring Systems Inc 5 25 07 23 6 Drawings ...
Страница 28: ...PureAire Monitoring Systems Inc 5 25 07 25 DQS cell Mounted to AirCheck Lite ...
Страница 29: ...PureAire Monitoring Systems Inc 5 25 07 26 Membrane ...
Страница 30: ...PureAire Monitoring Systems Inc 5 25 07 27 24VDC 3 wire is remote up to 1000 meters ...