04
P
U
R
E
-P
R
O
R
E
V
E
R
S
E
O
S
M
O
S
IS
S
Y
S
T
E
M
PRO
P
URE
DRINKING WATER S YS TEM
PRO
P
URE
DRINKING WATER S YS TEM
P
U
R
E
-P
R
O
R
E
V
E
R
S
E
O
S
M
O
S
IS
S
Y
S
T
E
M
07
PR-CH Office Water Cooler
PR-CH Office Water Cooler
Piping installation
Precaution
Provide at least 15cm space
between wall and dispenser.
Be sure to use correct power
voltage, plug power cord
directly into electrical socket.
Keep the water dispenser
away from sunlight.
Do not put dispenser on a
place where the kids can
reach easily.
FULL
HEATING
15cm
FULL
HEATING
FULL
HEATING
Water in installation method:
1.Dismantle original water tap and add tri-way socket & 1/4" inlet ball valve, see
drawing(A)
feed water connector
1/4" inlet ball valve
faucet
drawing(A)
2.Insert 1/4" PE pipe into 1/4" inlet ball valve and inlet connector, see drawing(B)
drawing(B)
Drainage water in installation method:
Insert 1/4" PE pipe into drainage connector, and another side putting
into drainage (do not have any block) then complete drainage water
installation method.
1/4" inlet ball valve
water in connector
1/4" PE water pipe