background image

 

Maintenance 

 

1.

 Header

– No maintenance required. 

 

2.

 Injection 

Tube 

– No maintenance required. 

 

3.

 

Valve - Pneumatic

– Should be inspected annually to be sure that a) the 

 

diaphragm in  the actuator is not leaking air, b) the valve closes off tightly, c) the 

 

stem packing is not leaking steam. 

 

 

 

Valve - Electric

– Should be inspected annually to confirm that the stem packing 

 

is not  leaking and that the valve closes tightly. 

 

 Valve-Solenoid

– Requires no maintenance. 

 

4.

 Strainer

– Clean screen a few days after humidifier is put in operation and 

 annually 

thereafter. 

 

5. 

Steam Trap

 - Inspect annually 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Содержание INSTY-PAC

Страница 1: ...gravity to an open drain condensate cannot be elevated 4 Each condensate connection must have it s own steam trap Condensate connections cannot be combined together to a common steam trap 5 A common...

Страница 2: ...cking CSCC and chloride pitting of stainless steel components is not covered by warranty Do not use hydrochloric acid descalers or bleach to clean the tank Consult the factory if you are unsure about...

Страница 3: ...70 80 85 Relative Humidity Leaving Relative Humidity Leaving Relative Humidity Entering Relative Humidity Entering Non Wetting Distance With a Insty Pac Tube Assembly Having 6 Centers The above is ba...

Страница 4: ...wall for the supply connection If the alternate horizontal condensate drain connection is supplied cut a 1 1 16 diameter hole through the AHU or duct wall for the drain connection see Fig 3 3 Install...

Страница 5: ...supply inlet 5 Duct plate condensate 1 6 Tube support bracket 1 per tube bank 7 Flexible connector 1 per tube 1 NPT valve connection 4 2 6 3 Fig 2 Tube drain connection 3 4 NPT Header drain connection...

Страница 6: ...g bracket welded to header Notes 1 Center the multiple injection tube assembly in the duct height 2 The injection tubes should be mounted level within the duct or AHU 3 Install injection tubes with th...

Страница 7: ...g VAV high limit humidistat is required A minimum velocity of 300 feet per minute is required to avoid saturation and excessive fog travel Controls Fan Interlock Switch PURE Humidifier Co recommends t...

Страница 8: ...ure 5 Undersized humidifier 6 Automatic control valve not opening fully A Pneumatic valve operator leaking air B Valve stem sticking Humidifier Discharges Water 1 Faulty drainage A Return line pressur...

Страница 9: ...is not leaking air b the valve closes off tightly c the stem packing is not leaking steam Valve Electric Should be inspected annually to confirm that the stem packing is not leaking and that the valv...

Страница 10: ...9...

Страница 11: ...10...

Страница 12: ...11 141 Jonathan Blvd North Chaska MN 55318 Tel 952 368 9335 Fax 952 368 9338 www purehumidifier com...

Отзывы: