![Pure H2O QUATREAU 553-B Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/pure-h2o/quatreau-553-b/quatreau-553-b_user-manual_1626989011.webp)
————————————————————
INSTALLATION
VENTILATION REQUIREMENTS
It is recommended that a trickle vent is
cut into the top of the cupboard in which
the Quatreau 553-B and Quatreau Chiller/
Chiller Carbonator C20/CS20/C50/CS50
sits.
All chiller and chiller carbonator units must
vented adequately. A vent kit should be
purchased with each system. Ventilation
is cut into the base of cupboard under
the chiller and a duct run to the kick
board. The kickboard is also cut to permit
air to be drawn into the duct and a grille
provided.
————————————————————
INSTALLATION
POWER REQUIREMENTS
2 x 13A sockets.
Note:
For new kitchens a separate fused feed is
required for the Quatreau 553, Quatreau
Chiller/Chiller Carbonator C20/CS20/C50/
CS50.
INSTALL ATION