background image

7

MODEL# 9009SJP

ASSEMBLY INSTRUCTIONS

STEP 5

:

Once the initial 8 springs have been 

attached to their corresponding V-rings 

and openings on the Top Rail, attach the 

remainder of the springs (Part 14) in 

clockwise order from current springs.  

NOTE:

 

If you see that the Jumping Mat looks 

uneven, make sure to locate the proper 

V-Rings on the Mat to the correct Spring to 

avoid excessive pressure on the Mat.

STEP 4:

Using the T-Hook Spring Tool (Part 16), 

attach eight initial springs (Part 14) directly 

across from each other at “compass 

points” as shown.

NOTE:

 

Only use the T-Hook Spring Tool included 

with this product to attach the springs. 

NEVER use your hands only or other 

household tools to attach these springs.

We suggest that you count the V-rings on 

the mat as they line up to the holes in the 

top rail before continuing.

5

4

1

2

3

4

5

6

7

8

Содержание 9009SJP

Страница 1: ...100Lbs 45 Kgs TO BUILD TOOLS NEEDED CUSTOMER SERVICE GQBrands com CustomerService GQBrands com 1 866 498 5269 4401 Samuell Blvd Ste 150 Mesquite TX 75149 48 SUPER JUMPER KIDS TRAMPOLINE MODEL 9009SJP...

Страница 2: ...by GQBrands GLOBAL QUALITY BRANDS IS NOT RESPONSIBLE OR LIABLE FOR INDIRECT SPECIAL OR CONSEQUENTIAL DAMAGES ARISING OUT OF OR IN CONNECTION WITH THE USE OR PER FORMANCE OF THE PRODUCT OR OTHER DAMAGE...

Страница 3: ...pervisor s or jumper s judgment and or coordination Mount and dismount the trampoline with care as injury may result ALWAYS remove jewelry belt buckles or any other sharp objects before using the tram...

Страница 4: ...5 6 7L 7R x6 x6 x12 x12 x42 x12 x12 x1 x1 x6 x1 x1 x1 x1 x1 x2 Top Rail Hand Rail Base Right Bolt PlasticWasher Leg Cap Hex Nut SafetyNutCap Wrench T Hook Spring Tool Spring Center Hand Rail T Joint...

Страница 5: ...s T Section so that each Top Rail can be bolted to one side of the T Section NOTE Make sure that the Solid Edge of the T Section is facing away from the center of the circle for each Top Rail Section...

Страница 6: ...the Left side as shown on to a T Joint and secure with 1x Leg Cap Part 4 NOTE The Hand Rail Bases Parts 7L 7R need to have one leg in between to be able to have enough distance to connect Place the re...

Страница 7: ...r V Rings on the Mat to the correct Spring to avoid excessive pressure on the Mat STEP 4 Using the T Hook Spring Tool Part 16 attach eight initial springs Part 14 directly across from each other at co...

Страница 8: ...69 ASSEMBLY INSTRUCTIONS STEP 6 Place the Frame Pad Part 6 on top the Jumping Mat Stretch the Frame Pad so it completely covers all Springs and the Mesh of the Jumping Mat NOTE Make sure all springs a...

Страница 9: ...ith the push pins buttons located on the Hand Rails Make sure that the push buttons are fully secure in the Hand Rail Base STEP 8 Secure the Center Hand Rail Part 9 by attaching it to the Side Hand Ra...

Страница 10: ...ssing from my box or something was damaged during assembly can you send it to me Answer If it has been 30 days or less from the date of your initial purchase you can contact customer service for a rep...

Отзывы: