7
MODEL# 9009SJP
ASSEMBLY INSTRUCTIONS
STEP 5
:
Once the initial 8 springs have been
attached to their corresponding V-rings
and openings on the Top Rail, attach the
remainder of the springs (Part 14) in
clockwise order from current springs.
NOTE:
If you see that the Jumping Mat looks
uneven, make sure to locate the proper
V-Rings on the Mat to the correct Spring to
avoid excessive pressure on the Mat.
STEP 4:
Using the T-Hook Spring Tool (Part 16),
attach eight initial springs (Part 14) directly
across from each other at “compass
points” as shown.
NOTE:
Only use the T-Hook Spring Tool included
with this product to attach the springs.
NEVER use your hands only or other
household tools to attach these springs.
We suggest that you count the V-rings on
the mat as they line up to the holes in the
top rail before continuing.
5
4
1
2
3
4
5
6
7
8