Model: PW
RECOM
ALARM S
HOUSING
Lub
Lub
PRE-S
1) V
in
to
2) V
3) V
an
re
4) V
fo
m
ta
in
5) V
al
6) C
ha
H
o
up
6
7) V
th
in
re
ro
fr
8) U
sh
le
pr
m
WD Rev. B_12/
MMENDE
SETTINGS FO
GS:
be oil tempera
160°F
(Hi
alarm)
185°F (H
alarm)
195°F (H
shut down
be oil tempera
170°F
(Hi
alarm)
185°F (H
alarm)
195°F (H
shut down
TARTUP
Verify that all
nstalled and
orque values o
Verify that the
Verify that the
nd that the
emoved.
Verify that the
or proper
magnetic cent
aken into
nstallation of t
Verify that the
ligned.
Check to ensu
ave been fille
Housings equ
ilers should
pside of the
.
Verify on oil s
hat the rings
nside the hou
emoving the
otating the e
ee ring move
Units equipped
hould be ch
evels. Units
roper operat
motor rotation.
/2/2015
ED CONT
OR BEARING
ature settings
gh oil sump
igh bearing
igh bearing
setting)
ature settings
gh oil sump
igh bearing
igh bearing
setting
PROCED
piping has b
tightened to
on the flange
shaft rotates
mechanical s
e set tabs
motor has b
rotation, an
tering of the
consideratio
the coupling.
e unit has b
ure that bear
ed to the prop
ipped with c
have the o
shaft rotation
slinger ring f
are free an
sing. This ca
e inspection
element enou
ment.
d with auxiliar
hecked for p
should be
tion and hea
ROLS SE
G
(VG-32):
temperature
temperature
temperature
(VG-46):
temperature
temperature
temperature
DURES
been properly
o the proper
bolting.
freely.
seals are set,
have been
been checked
d that the
e motor was
on for the
been properly
ring housings
er level of oil
constant leve
oiler on the
n. See Figure
fitted pumps
nd not bound
n be done by
plugs and
ugh to verify
ry oil systems
proper oil fil
checked for
at exchanger
ETTINGS:
e
e
e
e
e
e
ALA
VIBR
I
u
p
a
a
y
r
,
n
d
e
s
e
y
s
.
l
e
e
,
d
y
d
y
s
l
r
r
9
1
:
RM SETTING
25°F
(High
35°F
(High
settin
RATION SET
0.20
alarm
0.45
shut d
It is the res
utilize safety
product. Te
are available
already purch
9) Pre-lubric
For ring
inspection
amount
inspection
and in the
bearing. A
started a
to startup
housings
be provid
main oil p
10) Hot servi
water, sh
GS FOR CAS
above pro
h temperature
above pro
h temperatu
ng)
TTINGS:
In/Sec RMS
m)
In/Sec RMS
down setting)
ponsibility of
y equipment
emperature m
e by custom
hased and ins
cate bearing
g lubricated
n plugs an
of oil throu
n holes in the
e end cover t
Auxiliary oil s
approximately
p. Verify oil c
. Sight flow
ded in the oil
pump is prime
ice pumps, s
hould be pr
Figure 6
SE RTD:
oduct tempe
e alarm)
oduct tempe
ure shut
S (High vib
S (High vib
)
f the end us
t to monito
monitoring de
mer request
stalled.
prior to st
d housings,
nd pour a
ugh the oil
e sleeve bea
trough at the
systems shou
y 30 minutes
circulation th
indicators s
return line. E
ed.
uch as boiler
re-heated pri
rature
rature
down
bration
bration
ser to
r the
evices
if not
tartup.
pull
small
ring
arings,
thrust
uld be
s prior
rough
should
Ensure
r feed
ior to
Содержание PWD
Страница 1: ......
Страница 2: ...Page 2 of 28 Model PWD Rev B_12 2 2015 INSTALLATION OPERATION MAINTANENCE Model PWD ...