22
set) and that the machines receive too little material. In that case, the strongly
contaminated material should be cleaned through a separate metal collector first and then
returned to production.
Strongly contaminated material will cause the entire production sequence to malfunction
from a certain degree onwards. There is a high degree of probability that continuous
production will no longer be possible then.