background image

5

Assembly

After unpacking your ShowerSpa, some assembly is required prior to installation.

Shower Arm Assembly

 

1.   Thread shower arm (3) into shower arm insert (4) completely. NOTE: Shower arm should pivot side-to-side.

  2.    Insert rubber washer (12) in shower head (2) and tighten shower head onto show arm (3).

Hand Shower Holder Assembly

  1.   Mark preferred mounting location of hand shower holder (7). Drill ¼" hole into wall surface (CAUTION: LIVE PLUMBING) for hand shower 

mount anchor (11).

  2.   Secure hand shower holder mount (5) to wall surface by tightening hand shower mount screw (10) into anchor (11). 

   3.  Slide hand shower holder (7) onto mount (11) and secure with set screw (8). 

After ShowerSpa is mounted to the wall

Hand Shower Assembly

  1.   Insert washer (12) into hexagon shaped end of hand shower hose (9) and attach to threaded outlet on bottom of ShowerSpa (1).  

Do not over-tighten.

  2.   Insert washer (12) into tapered end of hand shower hose (9) and attach to hand shower (6). Insert hand shower into holder (7).

Installation – New Construction

Extensive Remodel – New Finished Wall Surface

  1.   Prior to sheetrock, stub-out ½" hot and cold supply lines beyond 

finished wall surface, 4" on center. For best results, attach 90° 
brass fittings (available at most hardware stores) to the 

 

stub-outs maintaining ¼" – ½" of space between the fitting and 
finished wall. The open end of the 90° brass fittings should point 

down so the ShowerSpa's supply lines attach parallel to wall. 

1

 

  2.   For a person 5'8" – 6'2" we recommend stub-outs be 40" above 

finished floor. 

2

  3.   Before installation, make certain water is COMPLETELY 

TURNED OFF to both hot & cold supply lines of shower. 

 4a.   Mark location of holes for top mount, making sure holes are 

level. For a person 5'8" – 6'2", we recommend placing holes of 

upper mount at approx. 60" above finished floor. 

3

 4b.   To determine location for lower mount measure distance           

between indents on bottom edge of horizontal mounting bars 
on back of ShowerSpa (approx. 23

1

8

"). Using this distance,       

measure down from holes in upper mount to obtain location of 
holes in lower mount making certain mounts are plumb.

 4c.   Use mounts to mark location of holes for each mount.

  5.   Before drilling holes, make certain that connecting to stub-outs 

DOES NOT INTERFERE with backside of ShowerSpa and it is 

flush with finished wall at desired mounting height. 

2

  6.   Drill ¼" holes through wall surface using a masonry bit. Drill 

slowly through wall surface to avoid cracking and chipping. 
Insert anchors and securely screw brackets to wall. Before 
connecting hot and cold supply lines, hang ShowerSpa on wall, 

check height and make sure ShowerSpa is flush against wall 
with a secure fit.

  7.   Connect hot and cold water supply lines to stub-outs—DO NOT 

OVERTIGHTEN.

 Before mounting ShowerSpa, check fittings to 

make sure they are secure. Turn on water and check for leaks. 

When fittings are leak-free, mount ShowerSpa on wall.

 8.  OPTIONAL—Seal around body of ShowerSpa with a bead of 

silicone. DO NOT SEAL BOTTOM.

Содержание La Mesa ShowerSpa 7007

Страница 1: ...La Mesa ShowerSpa Model 7007 Owner s Manual LA MESA...

Страница 2: ...e necessary skills and or tools we recommend that a licensed plumbing contractor complete the installation If you encounter any problems during installation PLEASE VISIT CUSTOMER SUPPORT AT WWW PULSES...

Страница 3: ...1 97 in 1320 mm 3 94 in 100 mm 3 4 in 90 mm 5 75 in 146 mm 16 54 in 420 mm 7 09 in 180 mm 11 02 in 280 mm 2 58 in 65 40 mm 58 46 in 1485 mm 18 31 in 465 mm 7 87 in 200 mm 7 87 in 200 mm 8 27 in 210 mm...

Страница 4: ...Hand Shower Holder Mount 6 Hand Shower 7 Hand Shower Holder 8 Set Screw 9 Hand Shower Hose 10 Hand Shower Mount Screw 11 Hand Shower Mount Anchor 12 Rubber Washer 3 13 Wall Mount Bracket 2 14 Wall Mo...

Страница 5: ...e ShowerSpa s supply lines attach parallel to wall 1 2 For a person 5 8 6 2 we recommend stub outs be 40 above finished floor 2 3 Before installation make certain water is COMPLETELY TURNED OFF to bot...

Страница 6: ...ing of space between fitting and finished wall The open end of 90 fittings should point down so supply lines attach parallel to wall 1 7a Mark location of holes for top mount making sure holes are lev...

Страница 7: ...be used and no steel wool scouring pads or wire brushes as they may scratch copper surfaces Clean with hot soapy water and scrub with a soft nylon brush For tough stains try using a paste of baking so...

Страница 8: ...damage during shipment 4 Warranty on Repairs and Replacements For consumer purchasers who purchased the Product for home use repaired or replacement Products will continue to be covered under this war...

Отзывы: