To configure an archive task schedule, complete the following steps in the Task Schedule section on the Target tab:
1.
Click New.
2.
Enter a name for the archive task.
3.
Select a Start Time.
4.
Select an End Time. There are three types of end times:
Continuous.
The system will scan for data to archive every five minutes. (See the note at the beginning
of this section before selecting this option.)
Until Finished.
Archiving will continue until all applicable data is archived. There will be no additional
scans for data to archive until the start time on the next day.
User Defined.
Archiving will end at the specified end time. Enter the time desired. If the archive period
is not long enough to archive all applicable data, the remaining data will be archived during the next
applicable task.
NOTE:
The oldest applicable data will always be archived first. If you see a message in the Status section
(see the next page) that indicate the archive didn’t complete, consider increasing the length of the user-
defined task. Also, any applicable data recorded while the archive task is in progress will be archived if
there is enough time remaining in the task.
5.
If you select Until Finished or User Defined, select a Frequency for the task. Custom allows you to select days of
the week individually.
6.
Click Apply.
If desired, you can configure multiple archive tasks.