background image

 

3. Indication of the device operation. 
 

3.1 LED indication of operating status. 

The PSU is equipped with two diodes on the front panel: 

 

 

RED LED: 

 

on – the PSU is supplied with 230 V   

 

off – no 230 V supply 

 

GREEN LED: 

 

on – DC voltage in the AUX output of the PSU 

 

off – no DC voltage in the AUX output of the PSU 

 

 
 

3.2 Optical indication of the switch operation (see Table 8). 

 

Table 8. Indication of the switch operation 

OPTICAL INDICATION OF THE SWITCH's POWER SUPPLY 

 

GREEN LED LIGHT (Power) 
Indication of the switch's 
power supply 

 

 

OFF

 

– no power supply of the switch 

ON

 

– power supply on, normal operation 

 

OPTICAL INDICATION OF THE SWITCH's POWER SUPPLY (1

÷8) 

 

GREEN LED LIGHT (PoE) 
Indication of the PoE power 
supply at the RJ45 ports 
 

 

 

OFF

- no power supply at the RJ45 port (the device is not connected or not 

compliant with the IEEE802.3af/at standard) 

ON

 

– supply  

Blinking

 

– short-circuit or output overload 

YELLOW LED LIGHT (LINK) 
The connection status of LAN 
devices, 10 Mb/s or 100 Mb/s 
and data transmission 

 

 

OFF

- no connection 

ON 

- the device is connected; 10 Mb/s or 100 Mb/s 

Blinking

 

– data transmission 

 

OPTICAL INDICATION AT THE UPLINK PORTS  

 

YELLOW 
LED LIGHT 
(LINK) 

 

 
OFF

- no connection  

ON 

- the device is connected  

Blinking

 

– data transmission 

 

CAUTION!

  The operating status of the G1/TP, G1/SFP, G2/TP and G2/SFP 

slots is shown on the LEDs located near the RJ45 connector (see below). 
  

CAUTION! 

G1/TP and G1/SFP or  G2/TP and G2/SFP sockets can not operate 

simultaneously. 
These are COMBO type sockets. 

GREEN 
LED LIGHT 
(SPEED) 

 

 
OFF

 

– connection 10 Mb/s or 100 Mb/s 

ON 

- connection 1000 Mb/s  

 

CAUTION!

  The operating status of the G1/TP, G1/SFP, G2/TP and G2/SFP 

slots is shown on the LEDs located near the RJ45 connector (see below). 
 

CAUTION! 

G1/TP and G1/SFP or G2/TP and G2/SFP sockets can not operate 

simultaneously. 
These are COMBO type sockets.

 

 

Содержание SF108-B

Страница 1: ...backup time 5h 30min LED indication Metal enclosure color white RAL 9003 with space for two 17 Ah 12 V battery Supports auto learning and auto aging of MAC addresses 1K size warranty 2 year from the production date Example of use CONTENTS 1 Technical description 1 1 General description 1 2 Block diagram 1 3 Description of components and connectors 1 4 Technical parameters 2 Installation 2 1 Requir...

Страница 2: ...ction of any devices powered in the PoE PoE standard is enabled at the 1 8 ports of the switch The G1 TP and G2 TP ports is used for connection of another network device via RJ45 connector The switch is fitted with SFP two slots the use of fiber optic module GBIC allows fiber optic transmission The LEDs at the front panel indicate the operation status description in the table 8 The switch is house...

Страница 3: ...er power supply unit PSB 1552455 3 DC DC52230 Step up DC DC converter 4 Output filter 5 Tamper micro switch terminals of tamper protection NC 6 Battery space for two 2 x 17 Ah 12 V connect the batteries in series 7 Power supply connector of the PSU L N Protective connector electric shock 8 BAT BAT battery output BAT red BAT black Fig 3 The view of the switch ...

Страница 4: ...ndwidth 1 6 Gbps Transmission method Store and Forward Optical indication of operation Switch power supply Link Act PoE Status The given value of 30 W per port is the maximum value The total power consumption should not exceed 96 W Table 4 Electrical parameters Supply 200 240 V 50 Hz 1 A Supply power 110 W Output current at the PoE ports RJ45 8 x 0 6 A ΣI 2 A max Output voltage at the PoE ports RJ...

Страница 5: ... licenses applicable and required for a given country for 230 V and low voltage installations The device shall be mounted in confined spaces according to the environment class II with normal air humidity RH 90 max without condensation and the temperature from 10 C to 40 C The switch shall work in a vertical position that guarantees sufficient convectional air flow through ventilating holes of the ...

Страница 6: ... to the terminal marked with the symbol power supply module connector Use a three core cable with a yellow and green protection wire to make the connection Lead the cables to the appropriate clips through the insulating bushing of the connection board 4 Connect the power 230 V 5 Connect the battery mind the colours battery output V BAT cable red battery output 0V BAT cable GND black Caution Connec...

Страница 7: ...ith the IEEE802 3af at standard ON supply Blinking short circuit or output overload YELLOW LED LIGHT LINK The connection status of LAN devices 10 Mb s or 100 Mb s and data transmission OFF no connection ON the device is connected 10 Mb s or 100 Mb s Blinking data transmission OPTICAL INDICATION AT THE UPLINK PORTS YELLOW LED LIGHT LINK OFF no connection ON the device is connected Blinking data tra...

Страница 8: ...e PSU from the power supply network The PSU does not require performing any specific maintenance measures however in case of significant dust rate its interior is recommended to be cleaned with compressed air In case of fuse replacement use a replacement of the same parameters WEEE LABEL Waste electrical and electronic equipment must not be disposed of with normal household waste According to the ...

Отзывы: