background image

www.pulsar.pl 

                                                             HPSB7012E

 

 

 

7

 

RED LED: 

 

on – the PSU is supplied with 230V AC  

 

off – no 230V AC supply  

 

GREEN LED: 

 

on – DC voltage in the AUX output of the PSU 

 

off – no DC voltage in the AUX output of the PSU 

 

 

The shock protection circuit shall be performed with a particular care, i.e. the yellow and 
green wire coat of the power cable shall stick to one side of the terminal - marked with  

 symbol on the PSU enclosure. Operation of the PSU  without the properly made and 

fully  operational  shock  protection  circuit  is  UNACCEPTABLE!  It  can  cause  a  device 
failure or an electric shock. 

 
4. Connect the receivers’ cables to the terminals 

V+ (+), V-(-) 

of the PSU module.  

5. Connect the power (~230V) 
6. Connect the battery (mind the colours):   
- battery output (+V):  BAT+ cable / red, 
- battery output (0V):  BAT – cable / GND / black. 
7. Check the PSU operation indicator: green LED. 
8. Check the PSU output voltage: 
- the PSU voltage without load should amount to U=13,8V DC.   
9. After installing and checking proper working, the enclosure can be closed. 

 
3. Operating status indication. 

 
3.1 LED indication of operating status. 

The PSU is equipped with two diodes on the front panel:

 

 
 
 
 
 
 

 

 
 
 
4. Operation and use. 

 
4.1 Overload or short circuit of the PSU output (SCP on) 

In case of overload, the output voltage is automatically shut off, and so is the LED indicator. The restoration 

of the voltage takes place immediately after the failure (overload) is over. 

 

4.2 Disconnection of discharged battery. 

The PSU is equipped with the discharged battery disconnection system. During the battery-assisted operation, 

reducing voltage below 9,5V at the battery terminals will cause battery disconnection. 

 

4.3 Maintenance. 

Any and all maintenance operations may be performed following the disconnection of the PSU from the 

power supply network. The PSU   does not require performing any specific maintenance measures, however, in 
case of significant dust rate, its interior is recommended to be cleaned with compressed air. In case of fuse 
replacement, use a replacement of the same parameters. 
 

 

 
 
 
 
 
 
 
 

Содержание HPSB 7012E

Страница 1: ...HPSB 7012E v 1 0 HPSB 13 8V 6A 65Ah Buffer switching power supply unit EN Edition 4 from 12 11 2013 Supercedes 3 from 16 09 2013...

Страница 2: ...ply to devices requiring stabilised voltage of 12 V DC 15 The PSU provides voltage of U 13 8 V DC Current efficiency 1 Output current 6A 1A battery charge 2 Output current 5A 2A battery charge Total d...

Страница 3: ...iption 1 PSU module 2 connectors see tab 2 3 green LED indicates AC power 4 potentiometer output voltage adjustment 5 BAT GND battery outputs BAT red GND black 6 TAMPER contact of sabotage protection...

Страница 4: ...www pulsar pl HPSB7012E 4 Fig 2 The view of the PSU...

Страница 5: ...y LED indication AC diode indicating AC power status AUX diode indicating DC power status at the PSU output red normal status on failure off green normal status on failure off Sabotage protection TAMP...

Страница 6: ...ees sufficient convectional air flow through ventilating holes of the enclosure Before installation prepare a PSU load balance 1 Output current 6A 1A battery charge 2 Output current 5A 2A battery char...

Страница 7: ...o U 13 8V DC 9 After installing and checking proper working the enclosure can be closed 3 Operating status indication 3 1 LED indication of operating status The PSU is equipped with two diodes on the...

Страница 8: ...t within 14 days from the delivery to the service centre of the manufacturer 6 The repair period mentioned in item 5 may be prolonged if there are no technical possibilities to carry out the repairs o...

Отзывы: