Operating parameters (tab.6) 

Operating temperature 

-10ºC...+40ºC (see: chart 1) 

Storage temperature 

-20ºC...+60ºC 

Relative humidity 

20%...90%, without condensation 

Vibrations during operation 

unacceptable 

Impulse waves during operation 

unacceptable 

Direct insulation 

unacceptable 

Vibrations and impulse waves during transport 

According to PN-83/T-42106 

 

 

 

Chart 1. Acceptable output current from the PSU depending on ambient temperature. 

 

2. Installation. 

 

2.1 Requirements. 

 

The buffer PSU shall be mounted by a qualified installer with appropriate permissions and qualifications for 

230V/AC installations and  low-voltage installations (required and  necessary for a given country). The device shall 
be  mounted  in  confined  spaces,  according  to  the  environment  class  II,  with  normal  air  humidity  (RH=90%  max. 
without  condensation)  and  the  temperature  from  -10°C  to  +40°C.  The  PSU  shall  work  in  a  vertical  positi on  that 
guarantees sufficient convectional air-flow through ventilating holes of the enclosure. 

 

Before installation, prepare a PSU load balance. 

 

1.  Output current 6,0A + 1,0A battery charge 
2.  Output current 5,0A + 2,0A battery charge 

 

Total device c battery: 7A max. 

 
As the PSU is designed for a continuous operation and is not equipped with a  power-switch, therefore an 

appropriate  overload  protection  shall  be  guaranteed  in  the  power  supply  circuit.  Moreover,  the  user  shall  be 
informed  about  the  method  of  unplugging  (usually  through  assigning  an  appropriate  fuse  in  the  fuse-box).  The 
electrical system shall follow valid standards and regulations. 
 
 

2.2 Installation procedure. 
 

1. Before installation, cut off the voltage in the 230V power-supply circuit. 
2. Mount the PSU in a selected location and connect the wires. 
3. Connect the power cables (~230Vac) to L-N clips of the PSU. Connect the ground wire to the clip marked by the 
earth symbol PE (PSU module connector). Use a three-core cable (with a yellow and green PE protection wire) to 
make the connection. Lead the cables to the appropriate clips through the insulating bushing of the connection 
board. 
 

Содержание HPSB 7012C

Страница 1: ...HPSB 7012C v 1 0 HPSB 13 8V 6A 17Ah Buffer switch mode power supply unit EN Edition 2 from 18 09 2012 Supercedes 1 st from 28 10 2011...

Страница 2: ...uninterrupted supply to devices requiring stabilised voltage of 12 V DC 15 The PSU provides voltage of U 13 8 V DC Current efficiency 1 Output current 6 0A 1 0A battery charge 2 Output current 5 0A 2...

Страница 3: ...f the PSU 1 3 Description of PSU components and connectors tab 1 tab 2 fig 2 Element no Fig 2 Description 1 PSU module 2 connectors see tab 2 3 green LED indicates AC power 4 potentiometer output volt...

Страница 4: ...4 Fig 2 The view of the PSU...

Страница 5: ...tery LED indication AC diode indicating AC power status AUX diode indicating DC power status at the PSU output red normal status on failure off green normal status on failure off Technical outputs TAM...

Страница 6: ...onvectional air flow through ventilating holes of the enclosure Before installation prepare a PSU load balance 1 Output current 6 0A 1 0A battery charge 2 Output current 5 0A 2 0A battery charge Total...

Страница 7: ...9 After installing and checking proper working the enclosure can be closed 3 Operating status indication 3 1 LED indication of operating status The PSU is equipped with two diodes on the front panel...

Страница 8: ...y repairs at the earliest convenienve however not later that within 14 days from the delivery to the service centre of the manufacturer 7 The repair period mentioned in item 6 may be prolonged if ther...