Puhui T-960e Скачать руководство пользователя страница 3

LED SMT Reflow Oven T-960e

http://www.tech168.cn

2

closed-loop speed, equip with all the import 1:150 turbine speed reducer, smooth

operation, speed adjustable range 0-1600mm/min.

8. Adopt independent wheel structure and special stainless steel strut, durable

wear-resisting runs smoothly, speed precision can reach

±

10mm/min.

9. Independent cooling zone, to ensure the PCB board of low temperature when the

required.

10. Friendly human-machine operation interface, perfect LCD display, no need to

connect with the PC, can watch the whole repairing process very clearly.

11. Ergonomic design, practical and easily operated. Good build quality but at the

same time light weight and a small footprint allows the T-960e to be easily bench

positioned, transported or stored.

Technical parameters

Model

T-960e

The heating zone quantity

upper3/down2

The length of the heating zone

960mm

The heating type

IR and hot air heating

The cooling zone quantity

1

Maximum width of PCB board

300MM

The operation direction

left→right

Delivery options

Net transmission

chain transmission

The speed of conveyer belt

0-1600mm/min

The power supply

3 phase 5 lines 380V

Peak power

4.5KW

Heating up time

Around 15mins

Temperature control range

Room temperature

350

Содержание T-960e

Страница 1: ...LED SMT Reflow Oven T 960e LED SMT Reflow Oven Model T 960e Taian Puhui Electric Technology Co Ltd http www tech168 cn...

Страница 2: ...heating type oversized capacity wave selection have eight temperature waves can satisfy various welding technological requirements 4 Use programmable technology preset the temperature wave memory sto...

Страница 3: ...h the whole repairing process very clearly 11 Ergonomic design practical and easily operated Good build quality but at the same time light weight and a small footprint allows the T 960e to be easily b...

Страница 4: ...1200 630 470 Machine weight 88KGS Main parts Complete machine 1 Power line 1 User manual 1 Description of the main parts 1 Welding table main body 2 Control cabinet Panel 3 The instruction of the conn...

Страница 5: ...e N Zero wire PE Earth wire 380V lines connection L1 L2 L3 FireWire N1 N2 N3 Zero wire PE Earth wire 220V lines connection L1 L2 L3 parallel then connect with fire wire N1 N2 N3 parallel then connect...

Страница 6: ...set the corresponding temperature zone up and down press F5 goes to the heating interface 2 Five red switches separately control the upper 1 down 1 upper 2 upper 3 down 2 temperature zones 3 When the...

Страница 7: ...t waves each wave has five sections each section of the heating time and temperature all can alter You can reset the heating waves according to the solder required heating temperature and time Foundat...

Страница 8: ...mperature 20 40 higher than the solder paste melting point Set the reflow time 10S 60S If the peak temperature is low or the reflow time is short it will affect the welding quality and serious is caus...

Страница 9: ...he temperature about 30F Another way is that do not adjust the speed and increase the temperature properly The increase range standard is the temperature wave Adjust the temperature on the basis diffe...

Страница 10: ...fering resource 1 3 Do not put the oven exits and entrances face towards to the fan and the window 2 Power supply Please use five wire system380V Ensure the machine contacts the earth well and request...

Страница 11: ...mponents into the oven avoiding damage the net net and affect the temperature 4 8 Put lubricating oil into the transmission chain every 7 days 4 9 Do not put the inflammable and explosive dangerous go...

Страница 12: ...mission belt in the hot area please turn off the temperature and when cool down well and stop the transmission belt 10 Lubricate the driving rolls Put lubricating oil every two months 11 The motor wor...

Отзывы: