www.ptm
innovations.eu
INSTALLATION &
USER GUIDE
INSTALLATION
1. Make sure area is ready to receive the equipment, (working size and weight).
2. Unbox equipment and check that all parts received and no damage.
3. With a minimum of 2 people, position the equipment onto the work surface.
4. Adjust the legs so that the front of the machine is higher than the rear, this will aid drainage.
(Fig 1)
5.
Place into position, be sure to have the rear of the equipment flush with the rear of the work
area (Fig 1) and that enough room has been left to access the rear bottle area (Fig 2).
ITEMS REQUIRED PRIOR TO INSTALLATION
1. Work surface and space suitable for installation.
(Size can be found at the rear of this manual)
2. Pre-treatment machine
3. Filtered water (not supplied)
4. Pre-treatment solution (not supplied)
5. Waste bottle/container (not supplied)
Front
Work Surface
To Waste
Bottle
Front
Work Surface
To Waste
Bottle
Pipe
Kink
FIG 1
FIG 2
Bottle 1: pre mixed dark garment pre-treat
Bottle 2: filtered water for maintenance
Bottle 3: pre mixed light garment pre-treat
1 2 3