 - Connection of power to the Master and Secondary Nodes are as follows: 

Electrical Service Requirements - 120V, 15A, 1PH service  

Power can be run directly to the Node panel.  Feed line should be sized appropriately for 
the length of run to meet the electrical service requirements. 

1.

 

Connect the power wires to the Node panel as follows (see Figure 1). 

 

Incoming hot to Black terminal block on the left side of the power supply. 

 

Incoming neutral to be landed on terminal 40. 

 

Ground to be landed on terminal 8. 

 Figure 1 

Note: 

All AC wiring should be routed away from DC Communication and Control wiring and 

should never intersect or cross.

 

 

 

 

 

 

 

 

 

Содержание TSC 1500XL

Страница 1: ...L Installation Instructions Please read all instructions before attempting installation or operation of these units SAVE THESE INSTRUCTIONS FOR FUTURE USE PUBLICATION NO 8 5 1 7 5 1 2 3 0 R e v A A p...

Страница 2: ...TSC 1500XL 1 Contents Section Page No Introduction 2 Cautions and Warnings 3 Installation 5...

Страница 3: ...tor can easily reprogram each of the passwords to fit their individual security requirements Further the administrator can change the passwords as frequently as necessary TSC 1500XL was designed with...

Страница 4: ...TSC 1500XL 3...

Страница 5: ...sed on job No Substitutions Installation Procedure System consists of a Master Node panel and one or more Secondary Node panels dependent on the size of the job and one touchscreen supplied by Perform...

Страница 6: ...ly for the length of run to meet the electrical service requirements 1 Connect the power wires to the Node panel as follows see Figure 1 Incoming hot to Black terminal block on the left side of the po...

Страница 7: ...ely for the length of run minimum recommended size as follows 12 AWG for up to 90 feet of run 10 AWG for 90 feet to 140 feet of run 8 AWG for 140 feet to 240 feet of run 6 AWG for 240 feet to 380 feet...

Страница 8: ...onnection on both ends The Master Node connection will connect on an open spot on the Ethernet Switch See figure 3 The Touch Screen connection will connect to the Ethernet port labeled Ethernet Figure...

Страница 9: ...wires Route Serial Data cable away from any high voltage lines when connecting to secondary node panels 1 Connect the Serial Data cable to the Master PLC as shown in Figure 5 Use the chart for correct...

Страница 10: ...ection at Secondary Node panels Figure 6 Figure 7 Note Follow installation below for connecting the RJ 45 connector to Serial Data cable this guide is also included with RJ 45 connector Ethernet cable...

Страница 11: ...cording to these instructions Failure to do this can result in an inoperative system sluggish response or inability to reliably control the system components NOTE Do not run communications cable throu...

Страница 12: ...nstallation of conduit and wire all open holes must be plugged by electrician Wiring Practices All AC wiring should be routed away from DC Communication and Control wiring and should never intersect o...

Страница 13: ...Performance Sports Systems 9200 E 146th Street Noblesville IN 46060 800 848 8034 www perfsports com...