PS Automation PSF-M301 Скачать руководство пользователя страница 10

 

10 

All internal parameters, like required motor torque, actual position, functional status, etc., are being permanently 
monitored during operation of the actuator PSF. This ensures that the actuator positions with optimum accuracy, and 
closes the valve always tightly. 

Cut-off in end positions 
During operation the cut-off in end positions is realized for the one end position at the position found/chosen and for 
the other end position via force depending on the settings for the DIP switch S2.1 (see chapter 7.2 Operating 
direction). 

9.

 

Uvedení do provozu / Commissioning 

 

Otevřete kryt (viz 5.), namontujte pohon na ventil (viz 4.), proveďte elektrické připojení  

     (viz 6.). 

 

Proveďte automatické (viz 9.1) nebo ruční uvedení do provozu (viz 9.2). 

 

Zavřete kryt. 

 

 

Open the cover (see chapter 5.), mount the actuator on the valve (see chapter 4.), connect the  

      electric supply (see chapter 6.). 

 

Perform automatic (see chapter 9.1) or manual commissioning (see chapter 9.2). 

 

Close the cover. 

9.1  Automatické uvedení do provozu / Automatic commissioning 

 

Zkontrolujte bezpečné spojení mezi ventilem a servopohonem. 

 

Ke spuštění automatického uvedení do provozu stiskněte tlačítko B2 na nejméně 7 sekund. 

-

 

Možnost 1: „Otevírání silou – zavírání silou“: Pohon jede do otevřené koncové polohy silou a znovu zpět 
do zavřené koncové polohy. 

-

 

Možnost 2: „Otevírání s kalibrovaným zdvihem“ (20/40 mm):  Uloží se zavřená koncová poloha a vypočítá 
se zdvih podle nastavení. Je-li možná dráha pojíždění menší než přednastavený zdvih, zmenší se zdvih pro 
provoz automaticky na vyplývající maximálně možnou hodnotu. 

 

Po úspěšném uvedení do provozu 7 x zabliká zelená LED. 

 

Poté stiskněte tlačítko B1 pro přechod do normálního provozu. 

 

Po úspěšném uvedení do provozu zkontrolujte zjištěný nebo zadáním požadované hodnoty nastavený zdvih 
a polohu ventilu. 

 

Neúspěšné uvedení do provozu je signalizováno rychlým blikáním zelené LED. Zkontrolujte montáž ventilu. 

 

K uvedení do provozu je potřeba, aby byl k dispozici zbývající zdvih nejméně 1 mm ve „směru zavírání silou“, 
než pohon dosáhne svého mechanického dorazu. Dále pohon musí mít možnost provádět zdvih nejméně 
5 mm. 

 

 

Ensure secure connection between valve and actuator.  

 

To start the automatic commissioning push button B2 for minimum 7 seconds. 

-

 

Option 1: If adjusted “open with force – close with force”, the actuator will drive to the final open valve 
position via force, and back to the final closed valve position. 

-

 

Option 2: If adjusted “open with calibrated stroke” (20/40 mm), the actuator will store the lower 
position and the stroke is calculated according to the settings. If the possible travel is smaller than the 
preset stroke, the operating stroke will be automatically reduced to the max. possible resulting value.  

 

After successful commissioning, the green LED is flashing 7 times. 

 

Push button B1 to return to normal operation. 

 

After successful commissioning, check the found or adjusted stroke by comparing the set value and the valve 
position. 

 

In case of unsuccessful commissioning the green LED is flashing quickly. Please check valve mounting. 

Содержание PSF-M301

Страница 1: ...Zm ny vyhrazeny Subject to changes Zkr cen n vod k obsluze PSF301 PSF302 Short Operating Instructions PSF301 PSF302 GB CZ Verze 2019 08 28 v r 8015029 2019 PS Automation GmbH...

Страница 2: ...tla tka Operator push buttons 8 7 4 Zobrazen stavu Status display 9 8 Provoz Operation 9 9 Uveden do provozu Commissioning 10 9 1 Automatick uveden do provozu Automatic commissioning 10 9 2 Ru n uvede...

Страница 3: ...den se nesm j v st spole n v jednom veden v dy je t eba pou t dv odd len veden Please protect all of the power supply and control cables in front of the terminals mechanically by using suitable measur...

Страница 4: ...pling 13 mm on the valve stem There must be a 1 mm gap between the pillars and the bracket 3 Insert the coupling pin again and fix the locking nut 4 Connect the actuator to electric supply see chapter...

Страница 5: ...the cover only in a dry environment roub s k ovou hlavou cross head screw Otev en Nejprve k ov m roubov kem v echny rouby uvoln te pot je zcela vy roubujte z t lesa p evodovky rouby jsou chr n n prot...

Страница 6: ...on 1 2 3 4 5 6 7 8 Sign l signal Po adovan hodnota set value Zp tn hl en polohy position feedback Nap t voltage Zap On Zap On Vyp Off Vyp Off Vyp Off Zap On Vyp Off Zap On Proud current Vyp Off Vyp Of...

Страница 7: ...tn ch hl en 2 10 V 4 20 mA Set value range feedback signal 2 10 V 4 20 mA Vyp Off Silov koncov poloha p i vysunut m v etenu ventilu Cut off by force if valve stem is in extended position Zap On Silov...

Страница 8: ...ioning Spustit Start Stisknout 7 s Push 7 seconds Ob LED sv t Both LEDs are on Kalibrace dokon ena Commissioning finished Zelen LED blikne 7x p i dokon en kalibraci zelen LED blik rychle p i nezda en...

Страница 9: ...s off Zap On Podp t Undervoltage Blikne 2 x 1 5 s vyp Is flashing 2 x 1 5 seconds off Zap On Chyba pam ti Memory error Blikne 3 x 1 5 s vyp Is flashing 3 x 1 5 seconds off Zap On Chyba po adovan hodno...

Страница 10: ...Je li mo n dr ha poj d n men ne p ednastaven zdvih zmen se zdvih pro provoz automaticky na vypl vaj c maxim ln mo nou hodnotu Po sp n m uveden do provozu 7 x zablik zelen LED Pot stiskn te tla tko B1...

Страница 11: ...the individual commissioning push button B1 minimum 7 seconds For manual operation use push buttons B1 and B2 until the required open valve position is reached Start commissioning of both positions an...

Страница 12: ...prostoru HR Vyh v n sp nac ho prostoru k zabr n n kondenzaci irokorozsahov s ov modul Pro nap jec nap t 100 240 V AC 1 Zv en druh kryt IP IP Zv en druhu kryt na IP67 Accessories options Position sign...

Отзывы: