background image

5

P Z 4

    

In-Ground Pool Installation

 

 

 

 

 

 

 

 

 

 

INSTALLATION ASSEMBLY USING

P15 STANDARD IN-GROUND KIT

 

 

CAUTION: Make sure the voltage is the same as prescribed on the side of the Prozone ozone generator. Overvoltage will void 

customer warranty. 

Pump

PZ4

Filter

Saddle Clamp

Assembly

¾” Hose

Saddle Clamp

Assembly

Check Valve

¼” Hose

 

¼” Hose

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

  Turn pump OFF. 

  Locate section of existing plumbing in which you choose to install the ENTRANCE leg of the bypass. Location should be in any 

accessible area after the pump, but before the filter. 

  Install Saddle Clamp Top & Bottom, (and adapters if needed), without Bushing, (this will be used as a guide for your installation hole). 

 

  Drill a 7/8” hole through one wall of the pipe, using power drill, being careful not to drill too deep to avoid penetrating the opposite side 

of the plumbing. 

  Locate section of existing plumbing in which you choose to install the EXIT leg of the bypass. Location should be in any accessible 

area after the filter, and heater (if equipped). 

  Repeat steps 3 & 4. 

  Remove both Saddle Clamp Assemblies. 

  Using components listed, mount one Saddle Clamp Assembly on Entrance bypass location with the INLET side of the Venturi Injector 

mounted in the Saddle Clamp Bushing, (ozone ports should be facing upward). 

  Using components listed, mount the other Saddle Clamp Assembly on Exit bypass location with the ½” x 3” PVC pipe mounted in the 

Saddle Clamp Bushing. 

  Attach one end of ¾” clear hose to Venturi Injector and secure with a metal clamp. Attach other end of ¾”clear hose to ½” x 3” PVC 

pipe and secure with a metal clamp.  

 

 

 

 

  

 

7/8” Hole Saw

Cut a 6” length of ¼” Polybraid Hose and connect one end to the open ozone port (Marked #1) on the Venturi Injector and the other

end to the OUTLET side of the Check Valve, (Make sure you can blow air through the Check Valve towards the Injector port). Secure

both ends with black plastic clamps.

Connect the remaining section of ¼” Polybraid Hose to the INLET side of the Check Valve and the other end to the barb on top of

the PZ4 Ozone Generator. Secure both ends with black plastic clamps.

Install the PZ4 Ozone Generator on base of pump pack using the metal screws and washers.

Connect the PZ4 Ozone Generator system to the circulation pump or timer. The Prozone system and the circulation pump should

start simultaneously. Use N.E.C. or local code grounding and installation procedures for swimming pool equipment.  

Injector

Clamp

Clamp

Air

Flow

Water Flow

Flow

Отзывы: