background image

18

Specifications

Specifications

19

Version 1.0 

| 19 |

| 18 | 

Version 1.0 

Selection of engines for lifting equipment

Group 

Intermittent Service

Short-Term Service

F.E.M.

ISO

Cycles/h

Starts/h

(ED%)

Operation period min

1 DM

M1

15

90

15

7.5

1CM

M2

20

120

20

7.5

1 BM

M3

25

250

25

15

1:00 AM

M4

30

180

30

15

2 MW

M5

40

240

40

30

3M

M6

50

300

50

30

4M

M7

60

360

60

60

5M

M8

60

360

60

>60

Capacity 

(ton)

A

B

D

R

T

Speed 

(50HZ)

m/min

Motor

(Kw)

Min. Radius

of turn

Beam 

Range

0.5

248

196

25

146

159

12.2

0.12

0.8

100

Capacity 

(ton)

A

B

D

R

T

Speed 

(50HZ)

m/min

Motor

(Kw)

Min. Radius

of turn

Beam 

Range

1

315

212

31

142

231

nov-21

0.4

0.8

52 - 145

2

325

220

36

142

231

nov-21

0.4

0.9

82 - 185

3

340

250

43

142

231

nov-21

0.75

1.0

100 - 185

5

400

291

54

142

231

nov-21

0.75

1.5

100 - 220

7.5

400

291

54

142

231

nov-21

0.75

1.8

100 - 225

10

500

370

70

142

231

nov-21

0.75

2.0

150 - 255

LOAD LEVEL

DEFINITION

CUBIC VALUE

AVERAGE DAILY OPERATION HOURS

1 (light)

Mechanism and parts 

are frequently under 

light load, and there is 

under light load, and 

there is no max. load 

unless exceptional con-

ditions.

K ≤ 0.50

≤ 2

2 ~ 4

4 ~ 8

8 ~ 16

≤ 16

> 16

2 (medium)

Mechanism and parts 

are frequently 

under light load, 

but also under 

max. load with 

low frequency

0.50 < K ≤ 0.63

≤ 1

1 ~ 2

2 ~4

4 ~ 8

8 ~ 16

≤ 16

3 (heavy)

Mechanism and parts 

are frequently under 

medium and heavy 

load.

0.63 < K ≤ 0.80 ≤ 0.5

0.5 ~ 1

1 ~2

2 ~ 4

4 ~ 8

8 ~ 16

4 (overweight)

Mechanism and parts 

are frequently under 

max. or almost reach 

max. load.

0.80 < K ≤ 1

≤ 0.25 0.25 ~ 0.5

0.5 ~1

1 ~ 2

2 ~ 4

4 ~ 8

1 BM

1:00 AM

2M

3M

4M

5M

% Operation hours

Load level 1

% Operation hours

Load level 2

% Operation hours

Load level 3

% Operation hours

Load level 4

Содержание PWH

Страница 1: ...PWH Powered Electric Chain Hoist User s Manual Manual de usuario Safety Warnings Advertencias de Seguridad...

Страница 2: ...e corresponding manual 3 Any assistance provided by Prowinch LLC in the selec tion of the equipment the capacities and characteristics re quired by the clients is delivered free of charge and based on...

Страница 3: ...ric Chain Hoist 20 ft G80 Chain M3 H2 220 240V 1 Ton Electric Chain Hoist Power Trolley 20 ft G80 Chain M3 H2 220 240V Wireless 1 Ton Electric Chain Hoist 20 ft G80 Chain M3 H2 220 240V 1 Ton Electric...

Страница 4: ...aution warning and danger Attention to these areas ensures safety of operator Safety Precautions This symbol indicates a dangerous sit uation which if not avoided may cause minor or moderate wounds It...

Страница 5: ...sport people or lift or support loads over people Walk over chain Operate electric chain hoist with twisted kinked damaged or worn load chain Use load chain as a sling around load Operate a hoist if I...

Страница 6: ...ect and main tain your hoist 8 Always check correct hoist installation before use 9 Do not leave the load suspended for long periods of time It may cause deformation of the component or cause an acci...

Страница 7: ...ety Precautions Version 1 0 13 12 Version 1 0 Hanging Pendant Control Hanging Pendant Control Do not install the pendant control cable without the strain relief cable steel cord Make sure to connect b...

Страница 8: ...ke as soon as the electric power is cut off Thus the braking safety while loading is guaranted Light aluminum alloy shell light but hard The cooling fin is specially designed to en sure quick heat dis...

Страница 9: ...dity exceed range of Specification Chart Our hoists are designed to lift up and down under common atmospheric and working conditions Guarantee of service life and safety for Prowinch Electric Chain Ho...

Страница 10: ...00 185 5 400 291 54 142 231 nov 21 0 75 1 5 100 220 7 5 400 291 54 142 231 nov 21 0 75 1 8 100 225 10 500 370 70 142 231 nov 21 0 75 2 0 150 255 LOAD LEVEL DEFINITION CUBIC VALUE AVERAGE DAILY OPERATI...

Страница 11: ...Recommendations Capacity ton A B D E R T Speed 50HZ m min Motor Kw Min Radius of turn Beam Range 1 325 230 31 32 142 231 nov 21 0 4 0 8 52 145 2 375 245 31 44 142 231 nov 21 0 4 0 9 82 185 3 400 250 3...

Страница 12: ...tom block rollover of dou ble chain models Adequate supply of oil ITEMS INSPECTION METHODS STANDARDS Resolutions to Deviations Marks such as name plates labels etc Visual check Proceed with cleaning...

Страница 13: ...mensions Replace chain spring CHAIN Length Of Spring Standard 6 3 145 140 7 1 145 140 10 0 135 129 11 2 160 152 Attrition and opening of the hook Deformation damage and corrosion Visual check No remar...

Страница 14: ...ed in this User Manual to supply power to hoist Never bypass limit switches remove limit switch stops or alter limit switch devices Check the electric installation and wire gauge selection at www prow...

Страница 15: ...operation of hoist requires an operator who displays caution and good judgment The operator must be fully alert focused and aware of surroundings Job must be strictly carried out under the good pract...

Страница 16: ...Apply lubricant into chain bag to protect load chain 6 6 Check direction of chain eyes All welding points should be same direction Hoist cannot be operated prop erly unless all welding chain eyes are...

Страница 17: ...wiring diagram for single speed 2 4 directions wiring diagram for single speed 3 6 directions wiring diagram for single speed 4 2 directions wiring diagram for double speeds 5 4 directions wiring diag...

Страница 18: ...ed personnel Return of the product with a copy of proof of purchase to PROWINCH freight prepaid and insured are required for this warranty to be effective If more than one year has elapsed from purcha...

Страница 19: ...ems Remarks Does not move horizontally Rail declining Trolley movement Electric trolley manual trolley Inclined pull wheel is lifting Trolley movement Electric trolley manual trolley Gear occlusion pr...

Страница 20: ...Voltage drop Feed cable Movement does not correspond with switch button Movement did not correspond with switch button Motor wires connected Motor Connection error Internal wiring Push button switch S...

Страница 21: ...tor if value is infinite Leading wire break in assembly Change motor coil Vibration drop Avoid excessive bumping Motor Condition Reason Action Cause Correction No operation Braking coil burning Measur...

Страница 22: ...r if wire Vibration drop Avoid excessive bumping in usage Inside Wiring Transformer Condition Reason Action Cause Correction Non stop activation Junction welding burn out Change contactor if continuou...

Страница 23: ...Reference wiring diagram If limit switch cable is properly connected it is inversely connected Swap 2 wire power cords Wiring error Properly connect wire power cords as per wiring diagram Operation co...

Страница 24: ...sted Apply lubricating oil regu larly Exposure to water Use in dry places Influenced by seawater or chemical agent Inform us if used in special circumstances to safeguard range Load chain fractured Re...

Страница 25: ...tween wheel and gear Interference from out side material Check regularly Abnormal sound Improper adjustment circle Confirm adjustment circle number and insert position Insufficient confirma tion Insta...

Страница 26: ...t 6m Motor Power kW 0 65 kW Voltage V 220 240V 50 60Hz 1 Phase Motor Speed RPM 4 4 8 8 Insulation Grade Grade F Chain Type Grade G80 Chain Dimensions mm 8x24 mm 8x24 mm 8x24 mm Chain Falls U 2 Chain L...

Страница 27: ...65 kW 0 65 kW 0 65 kW Voltage V 24V Motor Speed RPM 4 4 8 Insulation Grade Grade F Chain Type Grade G80 Chain Dimensions mm 8x24 mm 8x24 mm 8x24 mm Chain Falls U 2 Chain Length Ft 40 ft 12 m Operation...

Страница 28: ...t 6 m 20 ft 6 m 20 ft 6 m 20 ft 6 m Motor Power kW 0 65 kW 0 65 kW 0 65 kW 0 65 kW Voltage V 220 240V 50 60Hz 1 Phase Motor Speed RPM 4 4 8 8 Insulation Grade Grade F Chain Type Grade G80 Chain Dimens...

Страница 29: ...6 m 20 ft 6 m Motor Power ft 0 65 kW Voltage V 110 60 hz Motor Speed RPM 4 4 8 Insulation Grade Grade F Chain Type Grade G80 Chain Dimensions mm 8 x 24 Chain Falls U 1 Chain Length Ft 20 Operation Te...

Страница 30: ...dant Control 12 SPECIFICATIONS 14 Advantages 16 Oil and lubricant recommendations 20 Inspection and maintenance 21 Installation Process 26 Unpacking 27 Handling precautions 29 Warranty 35 Troubleshoot...

Страница 31: ...e C V Vicente Guerrero No 403 Col San Miguel Apodaca Nuevo Leon Mexico C P 66649 52 81 8244 1351 PROWINCH COLOMBIA SAS www prowinch co Cl 163a 20 28 Bogot Colombia 57 1 7034035 PROVEEDORA INDUSTRIAL Y...

Отзывы: