
DP-503-F4A3 RAID SUBSYSTEM
Installation and User Manual
71
3.9.8 Generate Test Events
If you want to generate test events, move the mouse cursor to the main menu and click on the
Generate Test Events
Link. Tick on the
Confirm The Operation
and click on the
Submit
button. Then click on the
View Events/Mute Beeper
to view the test event.
3.9.9 Clear Events Buffer
Use this feature to clear the RAID subsystem’s System Events Information buffer.
Содержание DP-503-F4A3
Страница 1: ...DP 503 F4A3 RAID Subsystem Installation and User Manual Revision 1 1 P N PW0020000000322...
Страница 35: ...DP 503 F4A3 RAID SUBSYSTEM Installation and User Manual 35...
Страница 36: ...DP 503 F4A3 RAID SUBSYSTEM 36 Installation and User Manual...
Страница 37: ...DP 503 F4A3 RAID SUBSYSTEM Installation and User Manual 37...
Страница 38: ...DP 503 F4A3 RAID SUBSYSTEM 38 Installation and User Manual...