5
CAUTION:
Battery-operated guns may not deliver consistent screw tension. Drywall guns may not deliver
adequate tension.
Step 3.
Slide the load bar in the clamp plates to center the swivel bracket between the leg assemblies.
Ensure that the swivel bracket swivels freely without contacting the clamp plates. Tighten the
clamp plate fasteners to secure the load bar and attached swivel bracket in the proper position.
Torque the clamp plate fasteners to 30–35 ft-lbs (41-47 N-m) (see Figure 8).
Step 4.
Install an SRL meeting the requirements speci
fi
ed in Section 2.4 to the swivel bracket. The SRL
must be secured in the swivel bracket with the included 5/8 inch bolt (Figure 8). The bolt should
pass through the holes in the swivel bracket and the anchor point (e.g., swivel eye) on the SRL.
Do not substitute hardware other than provided with the standing seam anchor. If the bolt will
not
fi
t through the designated anchor point on the SRL; or if the SRL does not
fi
t within the swivel
bracket, the SRL is incompatible with the standing seam anchor and must not be used.
Figure 6 - Attaching Multiple Roof Anchors
4 x Panel Length
Minimum
2 x Panel Length
Minimum
4 Panels
Minimum
2 Panels Min.
Panel
Fasteners
Roof
Panel
Roof Edge
R
oof Edge
R
oof Edge
Figure 7 - Roof Anchor Installation
SRL Swivel Bracket
Clamp Plate
Adjustable
Leg Assembly
Setscrews
Seam Clamp
Panel Seam
Load Bar