TEKTINO
AC-200-dual USER MANUAL V2.30
5/14
OPERATION PREPARATIONS
Unlock load cells
.
Remove the two lock bolts, to release load cells of the two tanks, and to make them ready to work.
Warning:
1. Failure to remove the load cell lock bolts may cause wrong refrigerant processing amount.
2. When you need transport the machine, please screw those bolts on.
Fill equipment with refrigerant
(New equipment is empty, you need to fill the equipment
with refrigerant and refrigeration oil)
Through tank fittings, connect either HP or LP hose with external refrigerant R134a or
HFO-1234yf, and turn on the machine, select “Tank fill” function, set tank fill amount to fill
R134a or HFO-1234yf tank with refrigerant.
It is recommended to maintain refrigerant level of both tanks at 4-6kg.