Note:
Explanation of Symbols
A.
“- - -“
represents the temperature is lower than 100
℃
in standby mode,
and the handle put on the holder.
B.
“S-E”
represents the switch turned on but the connector of heat gun did not
connect to the station properly or the sensor of heat gun damaged, please
replace a new heat gun.
Terms of use
1. The air outlet and its surrounding area may be very hot. Be cautious of scald.
2. The heating handle shall not be put on the working table or other place
except its holder.
3. Please keep the air outlet unblocked.
4. Place the heating handle on its holder after the work, and keep it cool
naturally and turn into standby mode, then switch the power off.
5. The distance between the air outlet and the object shall be no less than 2mm.
6. Choose suitable nozzle in accordance with working requirements. Different
nozzles may have different temperatures.
Fuse replacement
When fuse is blown, replace with the same type of fuse. (see below picture)
1. Unplug the power cord from the power receptacle.
2.
The fuse holder is located under the AC power receptacle, use the slotted (–)
screwdriver
to loosen the fuse holder
3. Replace the fuse with new one
4. Put the fuse holder back in place
6
Содержание SS-969B
Страница 1: ...SS 969 SMD Rework Station User s Manual 1st Edition 2011 2011 Copy Right by Prokit s Industries Co Ltd...
Страница 9: ...SS 969 SMD 2011 2011001 8...
Страница 10: ...fuse 100 to 450 212 to 842 9...
Страница 11: ...1 2 SS 969 SMD x1 x1 x 3 x1 x 1 10...
Страница 14: ...100 9 IC 1 1 A 100 B S E 1 2 3 4 100 5 2 6 13...
Страница 15: ...1 1 2 3 4 5 2 3 50 14...
Страница 16: ...2011 Prokit s Industries Co LTD All rights reserved 2011001 C 15...