background image

Note:

 Explanation of Symbols

 

A.

 “- - -“

represents the temperature is lower than 100

 in standby mode,   

and the handle put on the holder. 

B.

 “S-E” 

represents the switch turned on but the connector of heat gun did not 

connect to the station properly or the sensor of heat gun damaged, please 

replace a new heat gun. 

 

Terms of use 

1.  The air outlet and its surrounding area may be very hot. Be cautious of scald.   

2.  The heating handle shall not be put on the working table or other place 

except its holder.   

3.  Please keep the air outlet unblocked. 

4.  Place the heating handle on its holder after the work, and keep it cool 

naturally and turn into standby mode, then switch the power off. 

5.  The distance between the air outlet and the object shall be no less than 2mm. 

6.  Choose suitable nozzle in accordance with working requirements. Different 

nozzles may have different temperatures. 

 

Fuse replacement 

When fuse is blown, replace with the same type of fuse. (see below picture)   

1.  Unplug the power cord from the power receptacle.   

2. 

The fuse holder is located under the AC power receptacle, use the slotted (–) 

screwdriver

 to loosen the fuse holder 

3.  Replace the fuse with new one 

4.  Put the fuse holder back in place   

   

 

6

Содержание SS-969B

Страница 1: ...SS 969 SMD Rework Station User s Manual 1st Edition 2011 2011 Copy Right by Prokit s Industries Co Ltd...

Страница 2: ...the fuse be sure turn off the power before operating During working period do not turn off the power suddenly the heat gun should be placed on the heat gun holder until cool off after power turn off...

Страница 3: ...ord by holding the plug not the wires Make sure the work area is well ventilated The Pro sKit SS 969 is not intended for use by children or infirm persons without supervision Children should be superv...

Страница 4: ...th brushless motor provides long service life quiet in operation 7 Safe solder QFP PLCC BGA and other temperature sensitive components Also for heating shrink viscidity removal lacquer removal preheat...

Страница 5: ...or desoldering multiple components Such as SOIC CHIP QFP PLCC and BGA etc especially for flat cables and cable connectors 2 Ideal for heating shrink viscidity removal lacquer removal preheating and mo...

Страница 6: ...has no operation for a long time Attention Please set up the temperature as lower as possible in high airflow volume as to prolong heating element service life and better IC chips protection Setting u...

Страница 7: ...ase keep the air outlet unblocked 4 Place the heating handle on its holder after the work and keep it cool naturally and turn into standby mode then switch the power off 5 The distance between the air...

Страница 8: ...atches the product requirement Problem 2 The temperature of the SMD station is not rising Description Display lights up but the temperature of heat gun is relative low and not heating up Solution heat...

Страница 9: ...SS 969 SMD 2011 2011001 8...

Страница 10: ...fuse 100 to 450 212 to 842 9...

Страница 11: ...1 2 SS 969 SMD x1 x1 x 3 x1 x 1 10...

Страница 12: ...1 LED 2 3 4 5 SS 969E SS 969E7 SS 969B SS 969H 110V 127V 220V 220V 700W 100 450 120 45dB LED 1 43kgs E E B H mm 170 170 140 mm 280x185x170 250V 10A 250V 10A 250V 5A 250V 5A 11...

Страница 13: ...9SS 969 A1 4 5 9SS 969 A2 7 5 9SS 969 A3 11 2 mm 5SS 969E HG SS 969E 110V 5SS 969B HG SS 969B H 220V 5SS 969E7 HG SS 969E7 127V 225x60x40mm wire length 115cm 1 SOIC CHIP QFP PLCC BGA 2 1 2 3 4 5 6 7 8...

Страница 14: ...100 9 IC 1 1 A 100 B S E 1 2 3 4 100 5 2 6 13...

Страница 15: ...1 1 2 3 4 5 2 3 50 14...

Страница 16: ...2011 Prokit s Industries Co LTD All rights reserved 2011001 C 15...

Отзывы:

Похожие инструкции для SS-969B