background image

 

 

for all your filter requirements 

Phone: 01422 377367 

email: [email protected] 

www.prosep.co.uk 

 
 

Prosep Filter Systems Ltd

 

Unit G19, River Bank Way, 
Lowfields Business Park, 
Elland, West Yorkshire 
HX5 9DN 

SYSTEM START UP:

 

 
 
Turn on the cold water supply at the stopcock and turn the cross piece on the saddle tap valve 
anti-clockwise to fully open. Close the tank ball valve. Open the tap for continuous flow (Lever 
to the side). Check the system for leaks, tighten as necessary. Connect the pump to a power 
supply  and  turn  on.  After  10-30  minutes,  water  will  start  to  drip  out  of  the  tap.  Let  it  drip  for 
about 10 minutes and then turn the tap off. TURN ON THE TANK BALL VALVE NOW. It may 
now take 2-4 hours for the storage tank to completely fill. 

 
Note: 

DO  NOT  DRINK  THE  WATER  FROM  THE  FIRST  TANK  PRODUCED  BY  YOUR  NEWLY  PURCHASED 

REVERSE OSMOSIS SYSTEM.

 

 
After  the  tank  is full  (you  will  hear  the  water  stop), flush  the  system  by placing  the  tap  in the 
open  position  until  all  the  water  is  completely  discharged.  Upon  complete  discharge  of  the 
storage  tank,  return  the  tap  handle  to  the  closed  position  and  let  the  refilling  process  begin. 
This process could take 2-4 hours to complete. After the second tank is filled, you may enjoy 
the  pure  water.  Check  for  leaks  daily  for  the  first  week  and  periodically  thereafter.  You  may 
notice that the water may be milky coloured during the first week. This is caused by air bubbles 
in the water released from the carbon filter, they will dissipate on allowing to stand. It is normal 
and safe. 

 
NOTE:

 

DO NOT USE WITH WATER THAT IS MICRO BIOLOGICALLY UNSAFE OR OF UNKNOWN QUALITY WITHOUT 
ADEQUATE  DISINFECTION  BEFORE  OR  AFTER  THE  SYSTEM.  SYSTEMS  CERTIFIED  FOR  CYST 
REDUCTION MAY BE USED ON DISINFECTED WATER THAT MAY CONTAIN FILTERABLE CYSTS. 
THIS  REVERSE  OSMOSIS  SYSTEM  CONTAINS  A  REPLACEABLE  COMPONENT  CRITICAL  TO  THE 
EFFICIENCY  OF  THE  SYSTEM.  REPLACEMENT  OF  THE  REVERSE  OSMOSIS  COMPONENT  SHOULD  BE 
WITH ONE OF IDENTICAL SPECIFICATIONS, AS DEFINED BY THE MANUFACTURER, TO ASSURE THE SAME 
EFFICIENCY AND CONTAMINANT REDUCTION PERFORMANCE. 

 
WARNING:

 

DO NOT USE THIS SYSTEM  TO PURIFY NON-DRINKABLE SOURCES OF WATER THAT 

 

 

ARE UNSAFE OR WITH WATER OF UNKNOWN QUALITY 

 
WARNING:

 

NEVER USE HOT WATER OR ALLOW THE UNIT TO FREEZE. 

 
WARNING: 

INCORRECT INSTALLATION WILL VOID THE WARRANTY. 

Содержание RP65139715

Страница 1: ...22 377367 email sales prosep co uk www prosep co uk Prosep Filter Systems Ltd Unit G19 River Bank Way Lowfields Business Park Elland West Yorkshire HX5 9DN INSTALLATION OPERATING INSTRUCTIONS SIX STAGE REVERSE OSMOSIS UNIT WITH PUMP RP65139715 ...

Страница 2: ... manual before proceeding with the actual installation Pay particular attention to all warnings cautions and notes Failure to do so could result in personal injury or damage to equipment or other property System and installation need to comply with local laws and regulations If you have questions please contact us CONTENTS PAGE DESCRIPTION 3 Checklist 3 Recommended Tools List 4 Product Specificati...

Страница 3: ... Prosep Filter Systems Ltd Unit G19 River Bank Way Lowfields Business Park Elland West Yorkshire HX5 9DN RP65139715 Reverse Osmosis Water storage tank with valve Tap assembly TOOLS LIST 1 Drill 2 Drill bits 1 8 1 4 7 16 3 1 2 and 9 16 spanner or adjustable 4 Philips screwdriver 5 Utility knife ...

Страница 4: ...FICATION 1st Stage 5 micron sediment filter HTPP DM 05N9 8 Change 6 monthly 2nd Stage Activated granular carbon type GAC GAC 9 Change 6 monthly 3rd Stage Carbon block cartridge type PAC PAC 9 Change 6 monthly 4th Stage Reverse Osmosis membrane 75 GPD 1812 75GPD As needed 2 years 5th Stage Post RO carbon filter AICRO 6 monthly 6th Stage Remineraliser and pH balance unit AIMCRO QC 6 monthly FLOW DIA...

Страница 5: ...r the sink to distinguish the cold pipe Do not fit the valve on a bend a join or where there is solder on the copper pipe Attach the clamp around the pipe and tighten the clamp bolt to ensure a water tight seal Do not over tighten the clamp bolt as this may distort the water pipe Firmly push the open end of the red tubing attached to the saddle tapping valve into the collar on the front of the sed...

Страница 6: ...urn the tap handle to the closed position and let the refilling process begin This process could take 2 4 hours to complete After the second tank is filled you may enjoy the pure water Check for leaks daily for the first week and periodically thereafter You may notice that the water may be milky coloured during the first week This is caused by air bubbles in the water released from the carbon filt...

Страница 7: ...he system and the other hand to turn the wrench clockwise to separate the head from the bowl NOTE IF IT IS TOO TIGHT TO OPEN THE HOUSING YOU MAY TRY TO UNPLUG THE FITTING BETWEEN THE RED TUBING AND THE SYSTEM IN ORDER TO REDUCE THE AIR AND WATER PRESSURE INSIDE THE HOUSING e To change the sediment cartridge and the pre carbon cartridge you need to open the clear and opaque housings remove the used...

Страница 8: ...all amount of water in storage tank System just starting up Air pressure in storage tank is low Normally it takes 2 3 hours to fill the tank Low water pressure and or temperature can reduce production rate Add pressure to storage tank The pressure should be 8 10 psi when the tank is empty Slow production Low water pressure Crimps in tubing Clogged pefilters Fouled membrane Make sure tubing is stra...

Отзывы: