proril GOCUT Series Скачать руководство пользователя страница 10

  

 

11 

 

 

 

ELECTRICAL HAZARD 

 

Risk of electrical shock. Make sure no one gets closer than 20 m or 65 ft. to the unit when being in contact with 

the pumped or mixed liquid. 

 

 

NOTICE 

The noise level of the product is lower than 70 dB However, the noise level of 70 dB may be exceeded in some 

installations and at certain operating points on the performance curve. Make sure that you understand the noise 

level requirements in the environment where the pump is installed. Failure to do so may result in hearing loss or 

violation of local laws. 

 

1.   Check and verify the nameplate for output and voltage required for the pump. 

2.   Check the wiring, power supply voltage, the capacity of the ground leakage circuit breaker, etc. 

3.   Start the pump. 

 

Trial Operation Non-Float Switch 

  

Run the pump for a short time (1 to 2 seconds) and verify the direction if the rotation of 

the impeller. If the starting jerk is counterclockwise (seen from above), the direction of its 

rotation is correct. If the direction of rotation is incorrect,

 

two of the wires should be 

switched (consult a certified electrician). 

 

 

 

CAUTION 

 

 

Make sure to check the pump's direction of rotation while the pump is not 

submerged in water. Otherwise, the pump will get damage, which may lead 

to current leakage and electrical shock. 

 

Never hold the handle while checking the direction of rotation. The starting 

jerk may be very violent. 

 

Operate the pump from 3 to 10 minutes and perform the following checks: 

 

Using an AC ammeter (clamp), measure the operating current at the phases U, V, and W that are 

connected to the terminal board. 

 

Using an AC voltmeter (tester), measure the voltage at the terminal board. 

 

Conditions

 

Description

 

Rated Output Variation

 

±10%

 

Voltage Variation without overheating

 

±10%, provided that it does not run

 

Frequency Variation

 

±1%

 

 

 

Proceed with the normal operation if no abnormal conditions are found during the trial operation. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Содержание GOCUT Series

Страница 1: ...2 Download the manual in your preferred language scan the QR code...

Страница 2: ...Float Switch Loction Installation Requirement Electrical Connection______________________________________________________________ 8 Connection Requirements External Protection Devices Grounding Earth...

Страница 3: ...s and health problems damage to the product and or product malfunction Hazard Notice Symbols DANGER A hazardous situation which if not avoided will result in death or serious injury WARNING A hazardou...

Страница 4: ...f long exposure to noise Never run the pump without water do not operate the pump out of water or insufficient water Do not use the pump if the power cable is damaged If you have any questions please...

Страница 5: ...se Turn the impeller by hand before using the pump Check the seals and the cable entry Additional information on the product specific information e g dimensions specifications performance curves for t...

Страница 6: ...und the pump working area Check for any explosion risk before pipe welding or use of any electrical hand tools Remove any remaining debris from the inlet piping system before installing the pump CAUTI...

Страница 7: ...OTICE For the water level required for operating the pump refer to the pump s dimensional drawing that can be obtained from our representative or company 6 Make sure that the impeller rotation is corr...

Страница 8: ...alog pressure sensor Two additional safety float switches can be installed in the dedicated Control System for high level and dry running alarm The thermal contacts thermistors must be in use The cabl...

Страница 9: ...to Operation Never operate the pump without safety devices installed Never operate the pump with the discharge valve closed Make sure that all safety guards are in place and secure Make sure you have...

Страница 10: ...tation of the impeller If the starting jerk is counterclockwise seen from above the direction of its rotation is correct If the direction of rotation is incorrect two of the wires should be switched c...

Страница 11: ...checkups and preventive maintenance will ensure a more reliable and safe operation An initial inspection of the pump within 3 to 4 months after installation is recommended Subsequent inspections maint...

Страница 12: ...13 CUTTING HAZARD Worn impellers often have very sharp edges Be very careful when replacing them Troubleshooting...

Страница 13: ...ate 5 Mech Seal 12 Strainer 6 Seal bracket 13 Base plate 7 Oil seal No enomination No Denomination 1 Motor 7 Agitator 2 Mech Seal 8 Wear plate 3 Pump casing 9 Inlet plate 4 Oil seal 10 Strainer 5 Shaf...

Страница 14: ...ischarge elbow 4 Oil seal 5 Shaft sleeve 6 Impeller enomination No Denomination 1 Motor 7 Pump casing 2 Mech Seal 8 Flange 3 Pump casing 9 Discharge elbow 4 Oil seal 5 Shaft sleeve 6 Impeller Part Lis...

Страница 15: ...16 enomination No Denomination 1 Motor 7 Pump casing 2 Mech Seal 8 Flange 3 Pump casing 9 Discharge elbow 4 Oil seal 5 Shaft sleeve 6 Impeller Part List SAVVY JUMBO BASE Pumps 4 5...

Страница 16: ...17...

Страница 17: ...ion Examples CP 1026 2018 November 1026th pump BS 1496 2017 August 1496th pump BN 1135 2017 December 1135th pump B 2017 P November C 2018 Q October D 2019 R September E 2020 S August F 2021 T July G 2...

Страница 18: ...UANGHUA RD DASHE DISTRICT KAOHSIUNG CITY 815 TAIWAN TEL 886 7 351 2306 MADE IN TAIWAN REV MN 2021 01 2021 PRORIL The original instruction is in English All non English instructions are translations of...

Отзывы: