- 10 -
START-UP
6) Verify for adequate tightness of all fastening
devices. Refer to torque chart on page 21.
7) Check oil level in hydraulic reservoir. Use
DEXTRON III or equivalent.
8) Check battery charge regularly to insure proper
functioning of emergency brakes. Ideal charge:
12.66 volts.
9) Do not forget to unlock the proper panel lock
before dumping.
BASIC START-UP PROCEDURES
1) Lubricate all grease fittings with a good quality
multiuse grease.
2) Lubricate panel release mechanism with good
quality oil.
3) Adjust tire pressure to manufacturer's
specifications.
4) Install wheels on hubs.
5) Install panels.
4
Содержание PUMA-10000
Страница 2: ...Copyright Les Machineries Pronovost Inc 2003 All rights reserved Printed in Canada ...
Страница 4: ......
Страница 14: ... 14 TRAILER PUMA 7000 8 170 02903 ...
Страница 17: ... 17 8 TRAILER PUMA 10000 170 02923 ...
Страница 23: ......