5.15 INSPECTION OF PARKING BRAKE CABLE TENSION
INSPECTION OF TENSION
Parking brake should be
checked after checking the me-
chanical brake of the axle.
• Hitch trailer to tractor. Park trailer and
tractor on level surface.
• Place securing chocks under one
trailer wheel.
• Turn the brake mechanism crank (2)
in direction (B) to engage the parking
brake - figure (5.13).
• Check tension of the cable (1).
• When the brake mechanism bolt
is maximally unscrewed, the cable
should be loose and hanging by ap-
proximately 10 to 20 mm.
ADJUST CABLE TENSION
• Unscrew the brake mechanism bolt
maximally (2) by turning the crank in
direction (A).
• Loosen nuts (4) of U-bolt clamps (3)
on handbrake cable (1).
3
4
A
B
2
1
1
623-I.03-1
10-20mm
10-20mm
Figure 5.13
Inspection of cable tension
(1) cable, (2) brake mechanism, (3) U-shaped clamp, (4) clamp nut
Содержание T700M/1
Страница 2: ......
Страница 3: ...INTRODUCTION ...
Страница 10: ...Introduction 8 PRONAR T700M 1 ...
Страница 11: ......
Страница 12: ......
Страница 15: ...BASIC INFORMATION SECTION 1 ...
Страница 30: ...Section 1 Basic information 1 16 PRONAR T700M 1 ...
Страница 31: ...SAFETY ADVICE SECTION 2 ...
Страница 48: ...Section 2 Safety advice 2 18 PRONAR T700M 1 ...
Страница 49: ...DESIGN AND OPERATION SECTION 3 ...
Страница 75: ...CORRECT USE SECTION 4 ...
Страница 110: ...Section 4 Correct use 4 36 PRONAR T700M 1 ...
Страница 111: ...TECHNICAL INSPECTION SCHEDULE SECTION 5 ...
Страница 145: ...MAINTENANCE SECTION 6 ...
Страница 161: ...TYRE SYSTEM SECTION 7 ...
Страница 164: ...ANNEX A A 2 PRONAR T700M 1 ...
Страница 165: ......
Страница 166: ......