SECTION 4
Pronar T683
4.13
TYPE OF MATERIAL
VOLUME WEIGHT
KG/M
3
compost
dry peat
950 – 1 100
500 - 600
Mineral fertilisers:
ammonium sulphate
potash salt
super phosphate
basic slag phosphate
potassium sulphate
kainite
milled lime fertiliser
800 - 850
1 100 – 1 200
850 – 1 440
2 000 – 2 300
1 200 – 1 300
1 050 – 1 440
1 250 - 1 300
Building materials:
cement
dry sand
wet sand
solid bricks
hollow bricks
stones
soft wood
hard sawn timber
impregnated timber
steel structures
milled burnt lime
cinders
gravel
1 200 – 1 300
1 350 – 1 650
1 700 – 2 050
1 500 – 2 100
1 000 – 1 200
1 500 – 2 200
300 - 450
500 - 600
600 - 800
700 – 7 000
700 - 800
650 - 750
1 600 – 1 800
Straw litter and bulk feeds
meadow hay dried in the swath
hay wilted in the swath
hay in gathering trailer (dry wilted)
wilted cut hay
dry baled hay
wilted baled hay
10 - 18
15 - 25
50 - 80
60 - 70
120 - 150
200 - 290
Содержание T683
Страница 2: ......
Страница 6: ......
Страница 11: ...SECTION 1 BASIC INFORMATION ...
Страница 25: ...SECTION 1 Pronar T683 1 15 DANGER Avoid contact of skin with oil Do not allow used hydraulic oil to spill ...
Страница 26: ...Pronar T683 SECTION 1 1 16 ...
Страница 27: ...SECTION 2 SAFETY ADVICE ...
Страница 45: ...SECTION 2 Pronar T683 2 19 FIGURE 2 3 Locations of information and warning decals ...
Страница 46: ...Pronar T683 SECTION 2 2 20 ...
Страница 47: ...SECTION 3 DESIGN AND OPERATION ...
Страница 73: ...SECTION 4 CORRECT USE ...
Страница 103: ...SECTION 5 MAINTENANCE ...
Страница 133: ...SECTION 5 Pronar T683 5 31 FIGURE 5 13 Trailer s lubrication points part 1 ...
Страница 134: ...Pronar T683 SECTION 5 5 32 FIGURE 5 14 Trailer s lubrication points part 2 ...
Страница 145: ...NOTES ...
Страница 146: ... ...