![PRONAR T669 Скачать руководство пользователя страница 110](http://html.mh-extra.com/html/pronar/t669/t669_operators-manual_1617401110.webp)
Pronar T669
SECTION 5
5.22
The ends of the pneumatic conduit (1) must be cut exactly at right
angles.
Clamping ring (3) should be fitted according to figure (5.10).
Reinforcing sleeve (4) of the conduit must be thoroughly depressed.
Check tightness of connections in accordance with Chapter (5.3.2).
FIG. 5.10
Installation of the pneumatic conduit
(1) pneumatic conduit, (2) connecting nut (3) clamping ring, (4) reinforcing sleeve
5.4
HYDRAULIC SYSTEM OPERATION
5.4.1 PRELIMINARY INFORMATION
Work connected with the repair, change or regeneration of hydraulic system components
(suspension cylinders, valves etc.) should be entrusted to specialist establishments, having
the appropriate technology and qualifications for this type of work.
The duties of the operator connected with the hydraulic system include:
Содержание T669
Страница 2: ......
Страница 6: ......
Страница 11: ...SECTION 1 BASIC INFORMATION ...
Страница 25: ...SECTION 2 SAFETY ADVICE ...
Страница 41: ...SECTION 2 Pronar T669 2 17 FIG 2 3 Locations of information and warning decals ...
Страница 42: ...Pronar T669 SECTION 2 2 18 ...
Страница 43: ...SECTION 3 DESIGN AND OPERATION ...
Страница 62: ...Pronar T669 SECTION 3 3 20 FIG 3 15 Electrical system schematic diagram the versions without the side lamps ...
Страница 65: ...SECTION 4 CORRECT USE ...
Страница 88: ...Pronar T669 SECTION 4 4 24 ...
Страница 89: ...SECTION 5 MAINTENANCE ...
Страница 117: ...SECTION 5 Pronar T669 5 29 FIG 5 11 Trailer s lubrication points part 1 ...
Страница 118: ...Pronar T669 SECTION 5 5 30 FIG 5 12 Trailer s lubrication points part 2 ...
Страница 132: ...Pronar T669 SECTION 5 5 44 ...
Страница 133: ...NOTES ...
Страница 134: ... ...