![proMtec u-ICC 2.45 compact Скачать руководство пользователя страница 10](http://html.mh-extra.com/html/promtec/u-icc-2-45-compact/u-icc-2-45-compact_manual_1617371010.webp)
Erro! Use a guia Início para aplicar Überschrift 1 ao texto que deverá aparecer aqui.
9
2.3 Installation
2.3.1 Installation of the Evaluation unit
The device is delivered with a sub plate with four holding flaps (H x B = 120 x
180 mm for Ø 6 mm).
In cause of the limitation of microwave cables you should find a place nearby
the measuring location, where you can also operate comfortably. If there is no
adequate place for a comfortable operation, there is also the option to
operate with your PC via integrated USB port.
2.3.2 Connections and dimensions of the evaluation unit
To get an overview about the circuit points and the way how to connect
them, there is following connection list.
Before opening the evaluation unit and for connecting of any cable the power
supply must be interrupted!
Choose a dedicated mounting location that the cables are strain-relieved!
Do not snap the microwave cables!
With connecting of the signal output mind the polarity! This signal output is an
active current output.
Do not torque down the coupling nuts onto the evaluation unit too much!