Power button
Power button on front left of VTrak D5600/D5800
Power on
With the power cables connected, the system can now be powered on. The power supply modules include the
cooling fans that cool the enclosure. Both power supplies should be powered up when starting the system. Make
sure the power switch on each power supply is in the
On
position. Note that this will power on the VTrak D5300
and VTrak D5320.
To power on the VTrak D5600 or VTrak D5800 subsystem, first switch on the power supplies in the back of
the unit, then press the power button on the front left bracket facing (see illustration below). Observe the LEDs
on the right front bracket facing.
Important
If you have a SAN, DAS, or Cascade with JBOD Expansion, al-
ways power on the JBOD subsystems first.
41
Promise
Technology
Hardware Setup
Содержание VTrak D5000 Series
Страница 16: ...Front view of VTrak D5600 Drive carriers Enclosure Power and Status LEDs 7 Promise Technology Introduction ...
Страница 170: ...Examples event event v event c 200 event a list i 852 c 200 161 Promise Technology Managing with CLI ...
Страница 218: ...Examples spare spare a add p 14 t g spare a del i 0 209 Promise Technology Managing with CLI ...
Страница 233: ...Examples ups v ups a mod s ups1 192 168 1 1 rtr 5 224 Promise Technology VTrak D5000 Series Product Manual ...
Страница 245: ...236 Promise Technology VTrak D5000 Series Product Manual ...