![ProMinent Ultromat ULFa 1000 Скачать руководство пользователя страница 81](http://html1.mh-extra.com/html/prominent/ultromat-ulfa-1000/ultromat-ulfa-1000_assembly-and-operating-instructions-manual_1616951081.webp)
16.3 Commissioning Report
Parameter:
Powde
r
Liquid
Concentration:
%
%
Active Ingredient:
-
%
%
Calibrated dosing capacity:
kg/h
Water supply:
l/h
Switching threshold flow monitor:
kg/h
Commissioning parameter
settings
Default setting
Setting
Min. water supply flowrate Ultromat
®
400
400 l/h
Min. water supply flowrate Ultromat
®
1000
1 000 l/h
Min. water supply flowrate Ultromat
®
2000
2 000 l/h
Min. water supply flowrate Ultromat
®
4000
4 000 l/h
Min. water supply flowrate Ultromat
®
6000
6 000 l/h
Min. water supply flowrate Ultromat
®
8000
8 000 l/h
Heating switch-on time
5 s
Heating switch-off time
45 s
Vibrator on
1 s
Vibrator off
60 s
Supply lead-in time
7 s
Supply run-on time
5 s
Stirrer 1 + 2 on time
5 min
Stirrer 1 + 2 off time
15 min
Stirrer 3 on time
5 min
Stirrer (3) off time
15 min
Concentration pump minimum frequency
20 Hz
Calibration settings / concentration:
Ultromat
®
commissioning report
A0824
ULFa
Version S7 Project:
Version Touchpanel:
Ident-Code:
Software Version:
Project number:
Powdered polymer trade name:
Supplier:
Liquid polymer trade name:
Supplier:
Customer:
Date:
Installation place:
Fig. 45: Commissioning Report
Systems / data sheets
81