3.
Replace the chlorine gas valve.
4.
Connect the connector cap to the chlorine gas valve.
11.4.16 Fitting All Components
1.
Fit all components of the production tank.
2.
Install the production tank in the system.
3.
Pour the collected product into the production tank. Retain a
small quantity of product in the measuring cup to test the
chlorine gas sensor.
11.5 Maintenance on the Lye Storage Tank
n
User qualification, maintenance: trained user, see
2.2 ‘User qualification’ on page 10
Preventative maintenance
86