5
Preparation for use
n
Adhere to all national and local regulations relating to the use
of chlorine.
n
The operator of the system is responsible for ensuring that the
regulations are implemented.
n
Ensure that the floor of the room has sufficient load-bearing
capacity to bear the weight of the filled system.
n
Ensure that the floor is even and horizontal and has a solid
base surface.
n
Ensure that the room has an adequately sized floor drain to
safely drain any escaping water in the event of a pipe leak.
n
Do not locate permanent workplaces in rooms in which the
system is situated.
n
Ensure that the room is free of aggressive vapours and chemi‐
cals.
n
Ensure that the room contains minimal dust.
n
Ensure that the room temperature and air humidity do not
exceed or fall below the permissible limits. The room may also
need to be air conditioned.
n
Protect the system from direct sunlight.
n
Ensure that there is adequate mechanical ventilation in the
room to prevent harmful substances accumulating in the
ambient air.
n
Allow a minimum gap of ≧ 30 cm for the cooling fan and for
maintenance to the left and right of the control cabinet.
n
Ensure that the room has suitable and adequate mains voltage
connections for operation of the relevant system.
n
Ensure that the room has an adequate supply of cooling water,
if cooling water is needed.
n
Prevent the system from toppling over, for example by fixing
the control cabinet to the wall or floor. Secure it in another way
should this not be possible.
n
Check the requirements relating to accessories, operated
together with the system in the same room, such as air separa‐
tion systems. Refer to the literature for the accessories.
n
Ensure that the rear wall of the system has a minimum dis‐
tance of ≧ 15 cm from the wall.
n
Use a non-return valve type BA for connection to the drinking
water network, as described in the German version of EN
1717:2000 or the German Technical and Scientific Association
for Gas and Water (DVGW) Technical Regulations. The
system requires a stable water pressure of 2.5 ... 5 bar down‐
stream of the non-return valve.
n
Set up the system, as described on the installation plan.
Preparation for use
21
Содержание Chlorinsitu-III
Страница 18: ...A1706 15 4 13 3 3 16 12 17 Fig 8 Components of the system side B Components of the system 18 ...
Страница 117: ...117 ...
Страница 118: ...118 ...
Страница 119: ...119 ...