
Standard liquid ends:
Interval
Maintenance work
Personnel
Quarterly*
n
Check the metering diaphragm for damage** - refer to
"Repair".
n
Check that the hydraulic lines are fixed firmly to the
liquid end.
n
Check that the suction valve and discharge valve are
fitted tightly.
n
Check the tightness of the entire liquid end - particularly
around the leakage hole - refer to
Ä
‘Standard liquid
ends:’ on page 29
!
n
Check that the flow is correct: Allow the pump to prime
briefly - turn the multifunctional switch briefly to "Test"
n
Check that the electrical connections are intact.
n
Check the integrity of the housing.
n
Check that the dosing head screws are tight.
Technical personnel
* Under normal loading (approx. 30 % of continuous operation)
Under heavy loading (e.g. continuous operation): Shorter intervals.
** Check the diaphragm frequently with feed chemicals that put particular pressure on the dia‐
phragm, e.g. those containing abrasive additives.
P_ALP_0011_SW
Fig. 7: Leakage hole
Maintenance
29
Содержание alpha ALPc 0230
Страница 4: ...18 Declaration of Conformity for Machinery 49 Table of contents 4...
Страница 21: ...P_MAZ_0001_SW 2 1 Fig 5 Standard installation 1 Main line 2 Storage tank Installation hydraulic 21...
Страница 50: ...50...
Страница 51: ...51...