USER GUIDE //
LOCKING SYSTEM PA-280
Review 09/19
3
INDEX
01
INTRODUCTION
01.1
Using this manual
························································································································
05
01.2
Meaning of Symbols
···················································································································
07
01.3
Serving request
·····························································································································
07
01.4
Demolition
······································································································································
07
01.5
Technical data sheet
····················································································································
09
02
WARNINGS
02.1
General warnings
·························································································································
10
02.2
Specific warnings
·························································································································
13
02.3
Contradictions and side effects
······························································································
15
02.4
Physical requirements of the operators
···············································································
15
03
INSTALATION
03.1
Transporting and unpacking
···································································································
16
03.2
Anchorage points
·························································································································
17
04
OPERATING
04.1
General elements of locking system PA-280
······································································
18
04.2
Elements of the locking manual system PA-280
·······························································
19
05
MOUNTING AND COMPONENTS
05.1
Main exploded view LOCKING SYTEM PA-281
···································································
21
05.1.1 Basic
exploded of locking system PA-281
······················································
22
05.1.2
Bill of materials
Basic
exploded of locking system PA-281
······················
23
05.1.3
Exploded bottom structure welding
·······························································
24
05.1.4
Bill of materials bottom structure welding
····················································
25
06
GENERAL MAINTENANCE
··········································································································
27
07
LEGAL NOTICES
·····························································································································
28
08
PRODUCT WARRANTY
················································································································
29
09
TRAINING REGISTER
·····················································································································
30
10
MAINTENANCE REGISTER
··········································································································
31