![Prolitec Air/Q 310 Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/prolitec/air-q-310/air-q-310_user-manual_1615444013.webp)
Installation
Step 4 – Installing the Top Anchors
Set the mounting bracket aside. Use an electric drill to make a
1
/
8
" hole at the exact
location you marked. This will serve as a guide for the anchors. Use a hammer
to tap the anchors in far enough so they stay well in position. Then screw them
straight into the drywall. Avoid screwing them in at an angle.
Hint:
If you use an electric drill with a Phillips driver head, make sure that the head
fits the anchor perfectly, as the anchor strips easily. Set the drill to a slow rotation.
Step 5 – Marking the Bottom Anchor Holes
Now you can mark the holes for the bottom anchors using the mounting bracket
as a template. Hold the mounting bracket in place and screw the flat-head screws
half way into the top anchors. This will prevent the bracket from moving. Now use
the pointy tool to mark the location for the two bottom anchors. Unscrew the top
screws and set the bracket aside.
11
Содержание Air/Q 310
Страница 1: ...Air Q 310 User Guide Revised 15 Jan 2013 Original Instructions...
Страница 2: ...2010 Prolitec Inc...
Страница 6: ...Unpacking 1 2 3 4 5 6 4...
Страница 17: ...Starting Up Features and Controls Output Ports Lock Air Stem Fragrance Cartridge Programming Panel 15...
Страница 34: ...Prolitec Incorporated 1235 Canal Street Milwaukee WI 53223 1667 1 866 387 4333 www prolitec com Part No 8530...