PROLIGHTS - EclSoft
LinearIP
83
1
Remove the gore valve from the connections panel.
2
Connect the air hose to the IPTESTBOX by inserting the quick-connect fitting into the coupler.
3
Insert the threaded end into the threaded valve hole socket.
For the operating procedure using the instrument, refer to the IPTESTBOX user manual.
Fig. 14
14 - TEST OF IP65 RATING
To check sealing after servicing use the IPTESTBOX.