1
WHEN
OPERATING THE PRINTER, ADHERE TO ALL PERSONAL AND SAFE HANDLING OF MATERIALS DESCRIBED IN THE SAFETY SECTIONS OF THE USER GUIDE.
SUPPORT & BUILD MATERIAL BOTTLE INSTALLATIONS
3D Systems Confidential
Unpack bottles and MSDS/SDS Sheet from
carton and
read the MSDS/SDS before
handling the materials.
A
B
A
B
C
Support Material Delivery Module
Part Material Delivery Module
Release Latch
Loosen bottle cap
to allow air to vent.
Open doors to the material delivery modules
. Open left and/or right material
delivery modules by pushing handle down and pulling out the compartment .
Install bottle into compartment and press bottle down until a click sounds.
To remove bottle, open delivery module;
press and hold release latch (C) down. Grip bottle handle and lift bottle out of module.
(D)
(A & B)
(E)
NOTE: Do not
place support material into build delivery modules and visa versa. Doing so can cause
damage to the printer.
NOTE: Be sure that the bottle is locked in place. If bottle is loose, press bottle down to
ensure it is latched. Close compartment.
NOTE: The illustration in this step depicts removing the support material module. This
step also applies to the build material module
.
NOTE: See ProJet
™
5000 User Guide for proper material bottle storage instructions.
½ turn counterclockwise
E
C
C
D
A
PN:316028-01
Position
1 2
3 4
SUPPORT
MDM
B
PN:316027-01
Position
1 2
3 4
PART
MDM
Quick Reference Guide
3-D Printer
ProJet™ 5000
P.N.: 316131-04, 02/12